Construction of a new school with 6 classrooms – Al Arqam ibn Al Arqam

Mali
|
Ville de senou

Problem/ Context

This initiative aims to provide children in Sénou and the surrounding areas with better access to education. The project to build the Dar Al-Arqam Ibn Al-Arqam school in Sénou, Bamako, Mali, aims to contribute to the development of educational provision in the locality.

Detailed project description

The project is currently in the preparatory phase. Its objective is to establish a new private school for primary and secondary pupils. The land required for construction has yet to be identified and secured. The project therefore requires support for site preparation, the construction of school buildings and the installation of essential equipment. The project is in its early stages; no construction work has yet begun.

Informations générales
Project applicant
Diallo Youssouf
Project initiator and local coordinator
Contacts
School name

Al arqam ibn al arqam

Location (village, region)
Ville de senou
Project category

Construction

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

1 school building with 6 classrooms
1 multi-purpose hall
1 administrative block
1 staff room

‍

Construction icone
Installations scolaires

6 toilet blocks
1 borehole/water pump
1 electrical/solar power system

‍

Construction icone
Equipment, Materials, and Furniture

310 desks and benches
70 sets of teaching materials
25 office desks and chairs
80 school kits

‍

Main needs

School construction,Extension: new classrooms,School facilities

Target learners

De 7ans à 18 ans

Coût du projet

Estimation to be made

Project status

Received

Les autres projets de construction

Retrouvez tous les projets en cours

School image description

For the past three years, we have been renting a room and space to house our preschool.
We started with 40 students and now have 80. We serve students in the younger, middle, and older preschool classes, as well as a special education class designed to support children who left public school at a very young age, as well as those facing learning challenges, to help them overcome them.
With our limited resources, we are struggling not only to build our own school but also to accommodate more students.

‍

Project overview ->
School image description

The school’s two buildings are unfinished and dilapidated; they have 4 and 2 classrooms, respectively, for a total enrollment of 357 students. There are more than 65 students per class. The desks and benches are broken and insufficient. Three or more students sit on each bench instead of two.

‍

Project overview ->
School image description

ESTABLISHED in 2000. I have been running this school for three years now. But there are no amenities for these students. Under the previous principal, enrollment was at a maximum of 90 students. When I arrived, after giving the school a few coats of paint, I had 120 students in the first year, then 180, and 187 this year.

‍

Project overview ->