Construction
Publié le
|
22/10/2026

Construction of a new school with 6 classrooms – Al Arqam ibn Al Arqam

Mali
|
Ville de senou

Problem/ Context

This initiative aims to provide children in Sénou and the surrounding areas with better access to education. The project to build the Dar Al-Arqam Ibn Al-Arqam school in Sénou, Bamako, Mali, aims to contribute to the development of educational provision in the locality.

Detailed project description

The project is currently in the preparatory phase. Its objective is to establish a new private school for primary and secondary pupils. The land required for construction has yet to be identified and secured. The project therefore requires support for site preparation, the construction of school buildings and the installation of essential equipment. The project is in its early stages; no construction work has yet begun.

Informations générales
Project applicant
Diallo Youssouf
Project initiator and local coordinator
Contacts
School name

Al arqam ibn al arqam

Location (village, region)
Ville de senou
Project category

Construction

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

1 school building with 6 classrooms
1 multi-purpose hall
1 administrative block
1 staff room

‍

Construction icone
Installations scolaires

6 toilet blocks
1 borehole/water pump
1 electrical/solar power system

‍

Construction icone
Equipment, Materials, and Furniture

310 desks and benches
70 sets of teaching materials
25 office desks and chairs
80 school kits

‍

Main needs

School construction,Extension: new classrooms,School facilities

Target learners

De 7ans à 18 ans

Coût du projet

Estimation to be made

Project status

Received

Other construction projects

See all current projects

School image description

We need to complete: Windows, Protectors, doors, benches, desks, chairs, toilets, electrical, solar, library furnitures and equipments. For 16 classrooms and toilets

Project details ->
School image description

There are too many pupils in each class, and the classrooms are not yet sufficient, as we only have 14 classrooms but 15 classes, not counting those with over-capacity.

‍

Project details ->
School image description

The pupils in the CI class are housed in a temporary shelter made of straw. There are 55 pupils in total, and they struggle to work properly given the circumstances. During break time, all the pupils go to the village square, which is about 400 metres from the school, to get their breakfast and often return late, hence the need for a school canteen.

Project details ->