Construction of a new school with 6 classrooms – Al Arqam ibn Al Arqam

Mali
|
Ville de senou

Problem/ Context

This initiative aims to provide children in Sénou and the surrounding areas with better access to education. The project to build the Dar Al-Arqam Ibn Al-Arqam school in Sénou, Bamako, Mali, aims to contribute to the development of educational provision in the locality.

Detailed project description

The project is currently in the preparatory phase. Its objective is to establish a new private school for primary and secondary pupils. The land required for construction has yet to be identified and secured. The project therefore requires support for site preparation, the construction of school buildings and the installation of essential equipment. The project is in its early stages; no construction work has yet begun.

Informations générales
Project applicant
Diallo Youssouf
Project initiator and local coordinator
Contacts
School name

Al arqam ibn al arqam

Location (village, region)
Ville de senou
Project category

Construction

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

1 school building with 6 classrooms
1 multi-purpose hall
1 administrative block
1 staff room

‍

Construction icone
Installations scolaires

6 toilet blocks
1 borehole/water pump
1 electrical/solar power system

‍

Construction icone
Equipment, Materials, and Furniture

310 desks and benches
70 sets of teaching materials
25 office desks and chairs
80 school kits

‍

Main needs

School construction,Extension: new classrooms,School facilities

Target learners

De 7ans à 18 ans

Coût du projet

Estimation to be made

Project status

Received

Les autres projets de construction

Retrouvez tous les projets en cours

School image description
  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

‍

Project overview ->
School image description

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Project overview ->
School image description

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Project overview ->