
Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school
The school’s two buildings are unfinished and dilapidated; they have 4 and 2 classrooms, respectively, for a total enrollment of 357 students. There are more than 65 students per class. The desks and benches are broken and insufficient. Three or more students sit on each bench instead of two.

The classrooms are unfinished, and the roof is damaged and leaks when it rains. The classrooms, designed to accommodate an average of 40 students, are overcrowded, and the school also turned away students at the start of the school year due to lack of space. Completing the two unfinished buildings
—one with four classrooms and the other with two—will boost teachers’ enthusiasm and motivation to share their knowledge and enable students to learn in good conditions. Purchasing new desks and benches will help reduce the shortage of seating in the classrooms, allowing students to sit in pairs during lessons.
EPP Fologo 2
Renovation
New classroom construction,Building renovation
620 élèves
29 977 $US Appr. 34 173 780 XOF
Approved
Retrouvez toutes les candidatures transmises par les villages

Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school


The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.