Construction
Publié le
|
August 29, 2026

Restoration of the restrooms and computer lab - CRS School

Sénégal
|
Thiaroye sud village

Problem/ Context

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

Detailed project description

The goal of this project is to provide children with better working conditions. CHALLENGES: - Dilapidated restrooms and desks and benches - Lack of teaching materials: scales, thermometers, globes, etc. - Lack of textbooks adapted to the curriculum. - Absence of a computer lab suitable for the school’s digitalization efforts.

Materials needed: - Hygienic and well-equipped restroom facilities. - Good-quality desks and chairs. - A newly built and well-equipped computer lab.

Project applicant
Mr. Cheikh Babou
CRS School Director
+221775795435
School name

CRS Elementary School

Location (village, region)
Thiaroye sud village
Project category

Construction

Main needs

New classroom construction,School facilities,Educational equipment

Target learners

420 students

Coût du projet

Under review

Project status

Received

List of needs
Construction icone
Buildings to Be Constructed

1 Computer Lab

Renovation icone
Renovation and Restoration

Painting: Interior and exterior of classrooms

Construction icone
Installations scolaires

3 new sanitary blocks (Sinks + drinking water)

Construction icone
Equipment, Materials, and Furniture

80 new desk-benches
30 equipment packs: globes...
120 school kits

School Photos

Toutes les autres écoles

Retrouvez toutes les candidatures transmises par les villages

Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school

Voir l'école
  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

Voir l'école

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

Voir l'école