Construction
Publié le
|
September 2, 2026

Renovation and Construction - Klapleu Elementary School

Côte d'Ivoire
|
Klapleu in the Blapleu sub-prefecture, Biankouma department

Problem/ Context

  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

‍

Detailed project description

The goal is to provide students and parents with a beautiful school that will inspire a love of learning.

Project applicant
Mr. Antoine DOUA
President of the Klapleu Development Association
0151493356
School name

Klapleu Primary School

Location (village, region)
Klapleu in the Blapleu sub-prefecture, Biankouma department
Project category

Construction

Main needs

Construction de nouvelles salles,Rénovation de bâtiments,Équipements scolaires

Target learners

358 élèves

Coût du projet

Under Review

Project status

Received

List of needs
Construction icone
Buildings to Be Constructed

School lunch

Renovation icone
Renovation and Restoration

Electrical installations:
1 CIE meter

Construction icone
Installations scolaires

Renovation work:
Masonry, Painting
Roof Repair and Waterproofing

Construction icone
Equipment, Materials, and Furniture

150 Desk-benches

School Photos

Toutes les autres écoles

Retrouvez toutes les candidatures transmises par les villages

TESTIMONI SPECIAL SCHOOLS NGBO LTD is experiencing increasing pressure on its existing classroom facilities as the number of students continues to grow. The school currently serves more than 600 students from JSS1 to SS3, with further admissions expected during the current term.
‍
The existing classroom facilities are not sufficient for the growing student population. Some of the available learning spaces are also below the standard learning environment the school seeks to provide, including classrooms with bare or sandy floors and open-sided conditions.

This shortage of suitable classroom space is becoming an important challenge to the school's ability to provide an adequate and comfortable learning environment for all its students. Without additional classrooms, continued growth in enrollment will place further pressure on the existing facilities.

The school therefore seeks support for the construction of additional permanent classrooms to increase capacity and provide students with a more suitable environment for teaching and learning.

Voir l'école

King’s Glory currently serves 883 learners in Kamuli District, including vulnerable children from families that struggle to meet education needs. The existing learning space is not sufficient for the number of learners being served. Additional classrooms are needed to reduce pressure on the existing facilities and provide a safer and more suitable environment for teaching and learning.

‍

Voir l'école

Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school

‍

Voir l'école