Construction of 6 Classrooms and Installation - Wimagak Primary School

Kenya
|
Karachuonyo , Kanyaluo

Problem/ Context

Wimagak Primary School currently serves 524 learners, comprising approximately 262 girlsand 262 boys from predominantly low-income households. The school faces severe classroom shortages due to increasing enrolment and the implementation of Kenya's Competency-BasedCurriculum (CBC) and Junior Secondary School (JSS) programme.The school currently has only eight classrooms, four of which are inadequate andovercrowded. PP1 and PP2 learners lack dedicated classrooms, compromising early childhoodlearning outcomes.

Wimagak Primary School currently faces a critical shortage of learning space.
Despite serving 524 learners, the school operates with only eight classrooms. Four of these classrooms are undersized and inadequate, while PP1 and PP2 learners lack proper classrooms entirely.

Detailed project description

Objectives

The proposed project will provide six fully equipped classrooms, serving approximately 240learners at a time, while significantly reducing congestion throughout the school. The projectwill also install a 10,000-litre rainwater harvesting system to address chronic water shortagesaffecting sanitation, hygiene, and learner welfare.The intervention will directly benefit 524 learners and 15 teachers and provide sustainableeducational infrastructure for future generations.

The school needs an additional six classrooms to:
• Accommodate current enrolment.
• Reduce overcrowding.
• Support CBC implementation.
• Create age-appropriate learning spaces.
• Improve educational outcomes.
The shortage of classrooms results in:
• Congested learning environments.
• Reduced learner participation.
• Lower teacher effectiveness.
• Challenges in classroom management.
• Reduced academic performance.

The school also experiences chronic water shortages, affecting sanitation, handwashing, and overall learner well-being.
Due to widespread poverty within the community, local resources are insufficient to address these infrastructure deficiencies without external support

The proposed project involves:

  1. Classroom Construction
    Construction of six permanent classrooms built to Ministry of Education standards.
  2. Classroom Furnishing , Provision of:
    • 240 learner desk sets.
    • Six teacher desk and chair sets.
    • Six classroom boards.
    Water Infrastructure
    Installation of:
    • Roof catchment system.
    • Gutters and downpipes.
    • 10,000-litre water storage tank.
  3. Accessibility Features
    Construction of disability-friendly ramps and access pathways to ensure inclusivity for learners living with disabilities.

‍

Informations générales
Project applicant
Nicholas Odiowuor Ondiek
Contacts
CEO/Founder
School name

Wimagak Primary School

Location (village, region)
Karachuonyo , Kanyaluo
Project category

Construction

Main needs

School expansion : new classrooms

Target learners

524 children + 15 teachers

Coût du projet

KES 12,800,000 ≈ $100,000 USD

Project status

Received

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

6 permanent classrooms
Disability-friendly ramps and access pathway

‍

Renovation icone
Renovation and Restoration

Painting
Flooring

‍

Construction icone
Installations scolaires

Rainwater Harvesting System
Roof catchment system.
Gutters and downpipes.
10,000-litre water storage tank

‍

Construction icone
Equipment, Materials, and Furniture

240 learner desk sets.
Six teacher desk and chair sets
Furniture and educational equipment

‍

School Photos

Toutes les autres écoles

Retrouvez toutes les candidatures transmises par les villages

The school’s two buildings are unfinished and dilapidated; they have 4 and 2 classrooms, respectively, for a total enrollment of 357 students. There are more than 65 students per class. The desks and benches are broken and insufficient. Three or more students sit on each bench instead of two.

‍

Voir l'école

ESTABLISHED in 2000. I have been running this school for three years now. But there are no amenities for these students. Under the previous principal, enrollment was at a maximum of 90 students. When I arrived, after giving the school a few coats of paint, I had 120 students in the first year, then 180, and 187 this year.

‍

Voir l'école

The school originally planned (32 classrooms) was not fully completed due to a lack of funding. The current capacity (6 classrooms) is insufficient to meet the needs of the village and the surrounding areas.