Construction
Publié le
|
30/07/2026

Construction of 26 New Classrooms - St Jean Bosco

Senegal
|
Toubab Dialaw

Problem/ Context

The school originally planned (32 classrooms) was not fully completed due to a lack of funding. The current capacity (6 classrooms) is insufficient to meet the needs of the village and the surrounding areas.

Detailed project description

St. Jean Bosco Elementary School is a private school founded in 2018 by Brother Nathanael Tabla, a member of the St. Jean Catholic community. It was established to make education more accessible to the village’s children by offering low tuition (between €15 and €30 per month). It is located in Toubab Dialaw, a village on the Petite Côte south of Dakar, Senegal.

  • The classrooms are unfinished; only the left wing has been built (see photos).
  • The current facility cannot accommodate the expected number of students in the Toubab Dialaw area. Some students travel long distances to Yenne High School.
  • There is no water fountain; 30-liter water jugs are brought to the school every day.
  • There is no cafeteria, no infirmary, and no first-aid kit on the school grounds.

The project to create the SAINT JEAN-BOSCO school complex comes at just the right time. This new school complex will help address certain challenges facing the municipality’s education system.

Vision: To build an environment where every child can envision success. A modern school will be made available to the school-age population in the area, along with local transportation options.

‍

Informations générales
Project applicant
Brother Nathanael Tabla
Founder of the school
Contacts
School name

Saint Jean Bosco Middle School

Location (village, region)
Toubab Dialaw
Project category

Construction

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

2nd building with 26 classrooms
School cafeteria, Computer lab
School fencing

‍

Renovation icone
Renovation and Restoration

Painting services

Construction icone
Installations scolaires

6 Toilet blocks + Sinks
Electrical installations
Water drilling

Construction icone
Equipment, Materials, and Furniture

180 two-seater bench desks
50-seat student transport bus

Main needs

Building new classrooms

Target learners

1,280 students

Coût du projet

87 175 $ US Appr. 49 690 000 XOF

Project status

Approved

School Photos

Other construction projects

See all current projects

School image description

We need to complete: Windows, Protectors, doors, benches, desks, chairs, toilets, electrical, solar, library furnitures and equipments. For 16 classrooms and toilets

Project details ->
School image description

There are too many pupils in each class, and the classrooms are not yet sufficient, as we only have 14 classrooms but 15 classes, not counting those with over-capacity.

‍

Project details ->
School image description

The pupils in the CI class are housed in a temporary shelter made of straw. There are 55 pupils in total, and they struggle to work properly given the circumstances. During break time, all the pupils go to the village square, which is about 400 metres from the school, to get their breakfast and often return late, hence the need for a school canteen.

Project details ->