We need to complete: Windows, Protectors, doors, benches, desks, chairs, toilets, electrical, solar, library furnitures and equipments. For 16 classrooms and toilets
Wimagak Primary School currently serves 524 learners, comprising approximately 262 girlsand 262 boys from predominantly low-income households. The school faces severe classroom shortages due to increasing enrolment and the implementation of Kenya's Competency-BasedCurriculum (CBC) and Junior Secondary School (JSS) programme.The school currently has only eight classrooms, four of which are inadequate andovercrowded. PP1 and PP2 learners lack dedicated classrooms, compromising early childhoodlearning outcomes.
Wimagak Primary School currently faces a critical shortage of learning space.
Despite serving 524 learners, the school operates with only eight classrooms. Four of these classrooms are undersized and inadequate, while PP1 and PP2 learners lack proper classrooms entirely.

Objectives
The proposed project will provide six fully equipped classrooms, serving approximately 240learners at a time, while significantly reducing congestion throughout the school. The projectwill also install a 10,000-litre rainwater harvesting system to address chronic water shortagesaffecting sanitation, hygiene, and learner welfare.The intervention will directly benefit 524 learners and 15 teachers and provide sustainableeducational infrastructure for future generations.
The school needs an additional six classrooms to:
• Accommodate current enrolment.
• Reduce overcrowding.
• Support CBC implementation.
• Create age-appropriate learning spaces.
• Improve educational outcomes.
The shortage of classrooms results in:
• Congested learning environments.
• Reduced learner participation.
• Lower teacher effectiveness.
• Challenges in classroom management.
• Reduced academic performance.
The school also experiences chronic water shortages, affecting sanitation, handwashing, and overall learner well-being.
Due to widespread poverty within the community, local resources are insufficient to address these infrastructure deficiencies without external support
The proposed project involves:

Wimagak Primary School
Construction
6 permanent classrooms
Disability-friendly ramps and access pathway
Painting
Flooring
Rainwater Harvesting System
Roof catchment system.
Gutters and downpipes.
10,000-litre water storage tank
240 learner desk sets.
Six teacher desk and chair sets
Furniture and educational equipment
School expansion : new classrooms
524 children + 15 teachers
KES 12,800,000 ≈ $100,000 USD
Received
See all current projects

We need to complete: Windows, Protectors, doors, benches, desks, chairs, toilets, electrical, solar, library furnitures and equipments. For 16 classrooms and toilets

There are too many pupils in each class, and the classrooms are not yet sufficient, as we only have 14 classrooms but 15 classes, not counting those with over-capacity.

The pupils in the CI class are housed in a temporary shelter made of straw. There are 55 pupils in total, and they struggle to work properly given the circumstances. During break time, all the pupils go to the village square, which is about 400 metres from the school, to get their breakfast and often return late, hence the need for a school canteen.