Expansion of Learning Facilities - 12 new classrooms - Kamuli

Uganda
|
Buwaiswa

Problem/ Context

King’s Glory currently serves 883 learners in Kamuli District, including vulnerable children from families that struggle to meet education needs. The existing learning space is not sufficient for the number of learners being served. Additional classrooms are needed to reduce pressure on the existing facilities and provide a safer and more suitable environment for teaching and learning.

‍

Detailed project description

King’s Glory Community Development Initiative (KGCDI) is seeking support to expand the learning facilities at King’s Glory through the construction of additional classrooms. The project will benefit 883 learners currently served from nursery through primary and secondary levels. KGCDI has land available for the expansion and has undertaken construction planning. The proposed support will help develop additional classroom space and improve the learning environment for vulnerable children and other learners from surrounding communities. KGCDI is ready to work with Action For Africa to agree on a practical priority construction phase based on the most urgent needs, technical assessment and available funding.

‍

Informations générales
Project applicant
Emmanuel Ntalaaza
Chairman
Contacts
School name

King's Glory primary and Heritage Schools

Location (village, region)
Buwaiswa
Project category

Construction

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

12 new classrooms
School cafeteria

‍

Renovation icone
Renovation and Restoration

School space planning

‍

Construction icone
Installations scolaires

‍

Construction icone
Equipment, Materials, and Furniture

Play area and sports field

Main needs

Construction of new classrooms

Target learners

883 students

Coût du projet

Estimation in proress

Project status

Received

School Photos

Les autres projets de construction

Retrouvez tous les projets en cours

School image description
  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

‍

Project overview ->
School image description

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Project overview ->
School image description

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Project overview ->