Construction
Publié le
|
18/10/2026

Construction of the permanent buildings - Integrity junior school

Uganda
|
Bujjuko

Problem/ Context

The school have temporary buildings which built by wooden structures and the class rooms aren’t enough. Inadequate classroom equipments like furniture desks, toilet, sanitation equipments (water)

‍

Detailed project description

To help and support integrity junior School dream for get a permanent Building
Class rooms , Furnitures like desks , sanitation equipments , toilet facilities

Informations générales
Project applicant
SHIRAT NAKIYINGI
Co-founder Classic African Community Empowerment organization
Contacts
School name

Integrity junior school

Location (village, region)
Bujjuko
Project category

Construction

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

1 school building
6 permanent classrooms

Construction icone
Installations scolaires

3 toilet blocks
1 electrical or solar power system

Construction icone
Equipment, Materials, and Furniture

80 desks and benches
12 items of office furniture
30 sets of teaching materials

‍

Main needs

New school construction,School expansion : new classrooms,School facilities,School supplies

Target learners

200-400 children

Coût du projet

estimaion to be done

Project status

Received

Les autres projets de construction

Retrouvez tous les projets en cours

School image description

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Project overview ->
School image description

For the past three years, we have been renting a room and space to house our preschool.
We started with 40 students and now have 80. We serve students in the younger, middle, and older preschool classes, as well as a special education class designed to support children who left public school at a very young age, as well as those facing learning challenges, to help them overcome them.
With our limited resources, we are struggling not only to build our own school but also to accommodate more students.

‍

Project overview ->
School image description

The school’s two buildings are unfinished and dilapidated; they have 4 and 2 classrooms, respectively, for a total enrollment of 357 students. There are more than 65 students per class. The desks and benches are broken and insufficient. Three or more students sit on each bench instead of two.

‍

Project overview ->