Construction of the permanent buildings - Integrity junior school

Uganda
|
Bujjuko

Problem/ Context

The school have temporary buildings which built by wooden structures and the class rooms aren’t enough. Inadequate classroom equipments like furniture desks, toilet, sanitation equipments (water)

‍

Detailed project description

To help and support integrity junior School dream for get a permanent Building
Class rooms , Furnitures like desks , sanitation equipments , toilet facilities

Informations générales
Project applicant
SHIRAT NAKIYINGI
Co-founder Classic African Community Empowerment organization
Contacts
School name

Integrity junior school

Location (village, region)
Bujjuko
Project category

Construction

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

1 school building
6 permanent classrooms

Construction icone
Installations scolaires

3 toilet blocks
1 electrical or solar power system

Construction icone
Equipment, Materials, and Furniture

80 desks and benches
12 items of office furniture
30 sets of teaching materials

‍

Main needs

New school construction,School expansion : new classrooms,School facilities,School supplies

Target learners

200-400 children

Coût du projet

estimaion to be done

Project status

Received

Les autres projets de construction

Retrouvez tous les projets en cours

School image description

Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school

‍

Project overview ->
School image description
  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

‍

Project overview ->
School image description

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Project overview ->