Construction of New Classrooms - St Jean Bosco

Sénégal
|
Toubab Dialaw

Problem/ Context

The school originally planned (32 classrooms) was not fully completed due to a lack of funding. The current capacity (6 classrooms) is insufficient to meet the needs of the village and the surrounding areas.

Detailed project description

St. Jean Bosco Elementary School is a private school founded in 2018 by Brother Nathanael Tabla, a member of the St. Jean Catholic community. It was established to make education more accessible to the village’s children by offering low tuition (between €15 and €30 per month). It is located in Toubab Dialaw, a village on the Petite Côte south of Dakar, Senegal.

  • The classrooms are unfinished; only the left wing has been built (see photos).
  • The current facility cannot accommodate the expected number of students in the Toubab Dialaw area. Some students travel long distances to Yenne High School.
  • There is no water fountain; 30-liter water jugs are brought to the school every day.
  • There is no cafeteria, no infirmary, and no first-aid kit on the school grounds.

The project to create the SAINT JEAN-BOSCO school complex comes at just the right time. This new school complex will help address certain challenges facing the municipality’s education system.

Vision: To build an environment where every child can envision success. A modern school will be made available to the school-age population in the area, along with local transportation options.

Project applicant
Frère Nathanael Tabla
Founder of the school
+221782880204
School name

Saint Jean Bosco Middle School

Location (village, region)
Toubab Dialaw
Project category

Construction

Main needs

Building new rooms

Target learners

1,280 students

Coût du projet

87 175 $ US Appr. 49 690 000 XOF

Project status

Approved

List of needs
Construction icone
Buildings to Be Constructed

2nd building with 26 classrooms
School cafeteria, Computer lab
School fencing

Renovation icone
Renovation and Restoration

Painting services

Construction icone
Installations scolaires

6 Toilet blocks + Sinks
Electrical installations
Water drilling

Construction icone
Equipment, Materials, and Furniture

180 two-seater bench desks
50-seat student transport bus

School Photos

Toutes les autres écoles

Retrouvez toutes les candidatures transmises par les villages

Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school

Voir l'école
  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

Voir l'école

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.