Construction
Publié le
|
October 17, 2026

Construction of 2 classrooms and 1 canteen – MU RUGO RUGALI GARILEA

Rwanda
|
Miyange

Problem/ Context

MU RUGO RUGALI GARILEA serves 143 children in a community where the school seeks to contribute to access to early childhood and primary education. Although the school has classrooms and a team of teachers and support staff, its infrastructure remains limited.Five of the seven existing classrooms are old and all seven are not enough to receive all the available customers where 77 pending children in this first term 2026 have not yet been registered.

The school also lacks a dedicated library, a suitable kitchen building and a dining hall. In addition, the school seeks a perimeter fence to define the school boundary and improve the management and security of the compound.

The school intends to extend its educational provision to Primary Five and Primary Six next academic year 2027-2028, subject to the required authorization but right now an urgent need is on expanding baby class and Primary one where we have ready children but no classes to put them in. Additional classroom space is therefore a priority. A library would give children greater access to storybooks and reference materials. A dedicated kitchen and dining hall would help organise meal preparation and pupils' meals more appropriately.

The school needs additional classrooms to support its planned expansion to find where to put received client in this first term that started on 07/09/2026 where we had 220 children but we managed to accommodate 143 only, others are still not registered and are willing to come any time we get two at least two classes to put them in. It also needs a library to encourage reading, a kitchen for food preparation, a dining hall for pupils' meals, and a perimeter fence to help define and secure the school compound.

Detailed project description

PROJECT SUMMARY

MU RUGO RUGALI GARILEA is a privately owned school located in Miyange Village, Kayonza Cell, Mukarange Sector, Kayonza District, Rwanda. The school currently serves 143 children enrolled in Baby Class, Middle Class, Top Class and Primary One to Primary Four.The school has seven classrooms, including two relatively new classrooms and five older ones. Its other facilities consist of four latrines and one small office.

The school has two laptops and one mini printer and employs seven teachers, one accountant, one Director of Studies, one cook, one security guard, one cleaner and one Head Teacher.The school needs additional classrooms to support its planned expansion to find where to put received client in this first term that started on 07/09/2026 where we had 220 children but we managed to accommodate 143 only, others are still not registered and are willing to come any time we get two at least two classes to put them in. It also needs a library to encourage reading, a kitchen for food preparation, a dining hall for pupils' meals, and a perimeter fence to help define and secure the school compound.

The school is seeking RWF 39,850,000 in financial or in-kind assistance from international donors mainly from Action for Africa, charitable foundations, Christian organisations and other development partners. The request covers:

  • Two classrooms (RWF 16,000,000),
  • a library (RWF 4,000,000),
  • a kitchen (RWF 4,000,000),
  • a dining hall (RWF 5,850,000),
  • and a perimeter fence (RWF 10,000,000).

The school reports that it owns the land intended for the project. Relevant land documents must be verified, and the project will be implemented in accordance with applicable education, construction and other approval requirements.The school management is committed to working with the appropriate authorities, qualified contractors and the funding partner to ensure responsible implementation, transparent use of funds and a focus on children's welfare.

A. Overall Objective

To improve the learning environment and facilities at MU RUGO RUGALI GARILEA through the construction and equipping of two classrooms, a school library, a kitchen, a dining hall and a perimeter fence.

B. Specific Objectives
1. Construct two classrooms to support the reception of available and ready customers/children this first term.
2. Establish a school library equipped with appropriate books and basic furniture to encourage reading and independent learning.
3. Construct a kitchen that provides suitable space for preparing and storing food safely and hygienically.
4. Construct a dining hall where pupils can eat in an organised and appropriate environment.
5. Construct a perimeter fence to define the school compound and support safer management of the premises.

Informations générales
Project applicant
Byiringiro Joseph
Contacts
School owner
School name

MU RUGO RUGALI GARILEA

Location (village, region)
Miyange
Project category

Construction

Main needs

School extension : 2 new classrooms

Target learners

220 children

Coût du projet

RWF 39,850,000 ≈ $30,000 USD

Project status

Received

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

2 new classrooms,
1 dining hall
1 school library
1 perimeter fence

‍

Construction icone
Equipment, Materials, and Furniture

80 tables and benches
25 sets of teaching materials

School Photos

Toutes les autres écoles

Retrouvez toutes les candidatures transmises par les villages

Wimagak Primary School currently serves 524 learners, comprising approximately 262 girlsand 262 boys from predominantly low-income households. The school faces severe classroom shortages due to increasing enrolment and the implementation of Kenya's Competency-BasedCurriculum (CBC) and Junior Secondary School (JSS) programme.The school currently has only eight classrooms, four of which are inadequate andovercrowded. PP1 and PP2 learners lack dedicated classrooms, compromising early childhoodlearning outcomes.

Wimagak Primary School currently faces a critical shortage of learning space.
Despite serving 524 learners, the school operates with only eight classrooms. Four of these classrooms are undersized and inadequate, while PP1 and PP2 learners lack proper classrooms entirely.

Voir l'école

Our pupil numbers have increased, and we have been forced to triple the size of the SIL and CP classes, double the size of the CM1 class, and use the parish hall – which is outside the school grounds – for the CM2 class. We therefore wish to plan ahead for the start of the next school year.

Voir l'école

In rural areas around Hargeisa, many children from low-income families face significant barriers to accessing quality education due to the lack of schools, long distances to existing educational facilities, and limited financial resources. As a result, many children are unable to attend school or continue their education. Girls and vulnerable children are particularly affected by these challenges. This project aims to address these problems by building a school that provides accessible, safe, and affordable quality education for children from disadvantaged families. The school will help improve literacy, create equal educational opportunities, and contribute to the long-term development of the local community.

Voir l'école