Construction
Publié le
|
26/08/2026

Construction 3 new classrooms - Daga Preschool

Senegal
|
Daga

Introduction

The schoolDaga Preschoolis located precisely in the villageDagain the city ofThiès. Country : Senegal/West Africa.The school needsConstructionof classrooms, equipments and school infrastructure.

General information
Project applicant
Mr. Mbaye NDOYE
School Principal
Contacts
School name

Daga Preschool

Location (village, region)
Daga
Target beneficiairy
80 students
School conditions

No school building Rental of space for classes Lack of primary school No toilets Absence of administrative office

Project category

Construction

Context

For the past three years, we have been renting a room and space to house our preschool.
We started with 40 students and now have 80. We serve students in the younger, middle, and older preschool classes, as well as a special education class designed to support children who left public school at a very young age, as well as those facing learning challenges, to help them overcome them.
With our limited resources, we are struggling not only to build our own school but also to accommodate more students.

‍

Detailed project description

In the short term, we would like to build three classrooms, restrooms, and an office. In the future, since our village has only one public elementary school and one middle school, we plan to expand the school by combining the elementary and middle schools to accommodate all students who struggle to succeed in the public school system. Because when they fail, they either drop out of school or have to travel to neighboring villages—which are 5 to 7 km away—to continue their education under often difficult conditions.

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

Preschool: 3 classrooms
One principal's office
*Long term: Primary and middle school

Construction icone
Installations scolaires

2 restroom blocks + sinks

Construction icone
Equipment, Materials, and Furniture

Preschool equipment:
Swings, toys, markers, chairs, notebooks...

Project category

Construction

Target learners

80 students

Cost estimation

Under review

Project status

Received

Other construction projects

See all current projects

School image description

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Project details ->
School image description

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Project details ->
School image description

The school’s two buildings are unfinished and dilapidated; they have 4 and 2 classrooms, respectively, for a total enrollment of 357 students. There are more than 65 students per class. The desks and benches are broken and insufficient. Three or more students sit on each bench instead of two.

‍

Project details ->