Action Education is a programme initiated to guarantee access to education for all children and to provide them with equal opportunities for learning, regardless of their place of residence.
The objective is to address the significant infrastructure challenges faced by schools on rural regions. Schools are invited to submit requests for school infrastructures : construction, renovation, equipment and installations.
- The construction and *renovation of classrooms
- The installation of latrines, toilets, and water fountains
- The distribution of school supplies and materials.
*Masonry, painting, carpentry, and plumbing work... ..
To submit a school project, please use the registration form link below. A selection will be made afterward. For more information, please visit the Frequently Asked Questions
Le fonds Action Education est actuellement en cours de constitution.
Il s'élève à 5 000 000 $USD soit environ 3 milliards de FCFA, pour la période 2025 à 2030. Ce financement, assuré par les membres et partenaires couvrira l'ensemble des activités prévues dans le cadre du programme.
Please find the answers to frequently asked questions about the programme in the FAQ section -->
The Konankro State Primary School (EPP), situated in the Bodokro sub-prefecture in the Gbêkê region of Côte d’Ivoire, has around 120 pupils. Despite its vital role in the education of local children, the school requires additional facilities to improve learning conditions and meet the needs of its pupil population. The lack of sufficient classrooms limits the school’s ability to accommodate pupils in suitable conditions.
Furthermore, the shortage of suitable accommodation for teachers makes it more difficult for them to settle in the area and may jeopardise their long-term commitment to the school. In light of this situation, the construction of three additional classrooms and two staff flats is a pressing priority. The completion of these facilities would help to improve the school environment, facilitate the work of teachers and provide pupils with better conditions in which to learn and succeed.

EPP KONANKRO
Construction
3 additional classrooms
2 staff accommodation units
1 office and 1 multi-purpose hall
3 latrine blocks
1 school fence
1 electrical system
1 borehole or water pump
90 desks and benches
10 items of office furniture
25 packs of teaching materials
School construction,Extension: new classrooms,School facilities,School equipment
120 new children
Estimation to be done
Received

Klapleu Primary School
Construction
School lunch
Electrical installations:
1 CIE meter
Renovation work:
Masonry, Painting
Roof Repair and Waterproofing
150 Desk-benches
Construction de nouvelles salles,Rénovation de bâtiments,Équipements scolaires
358 élèves
Under Review
Received
The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

Klapleu Moderne Secondary School
Construction
4 new classrooms
1 school canteen
1 Fontaine d'eau
120 Desk-benches
Construction of new classrooms,School facilities
173 STUDENTS
Under review
Received
ESTABLISHED in 2000. I have been running this school for three years now. But there are no amenities for these students. Under the previous principal, enrollment was at a maximum of 90 students. When I arrived, after giving the school a few coats of paint, I had 120 students in the first year, then 180, and 187 this year.

Kennedy 2 Preschool in Daloa
Equipement
2 new classrooms
School cafeteria
Painting and carpentry work
Tile and ceiling installation
4 Toilet blocks + Sinks
100 small tables and chairs
Swings and playground equipment
School supply kits
Building renovation,Educational facilities
200
17 280 $ US Appr. 9 849 600 XOF
Received
The school’s two buildings are unfinished and dilapidated; they have 4 and 2 classrooms, respectively, for a total enrollment of 357 students. There are more than 65 students per class. The desks and benches are broken and insufficient. Three or more students sit on each bench instead of two.

EPP Fologo 2
Renovation
New classroom construction,Building renovation
620 élèves
29 977 $US Appr. 34 173 780 XOF
Approved