Restoration of the restrooms and computer lab - CRS School

Senegal
|
Thiaroye sud village

Introduction

The schoolCRS Elementary Schoolis located precisely in the villageThiaroye sud villagein the city ofDakar. Country : Senegal/West Africa.The school needsInstallationsof classrooms, equipments and school infrastructure.

General information
Project applicant
Mr. Cheikh Babou
CRS School Director
Contacts
School name

CRS Elementary School

Location (village, region)
Thiaroye sud village
Target beneficiairy
420 students
School conditions

Defective condition of the toilets Outdated desks and benches Lack of teaching materials Lack of textbooks No computer lab

Project category

Installations

Context

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Detailed project description

The goal of this project is to provide children with better working conditions. CHALLENGES: - Dilapidated restrooms and desks and benches - Lack of teaching materials: scales, thermometers, globes, etc. - Lack of textbooks adapted to the curriculum. - Absence of a computer lab suitable for the school’s digitalization efforts.

Materials needed: - Hygienic and well-equipped restroom facilities. - Good-quality desks and chairs. - A newly built and well-equipped computer lab.

‍

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

1 Computer Lab

Renovation icone
Renovation and Restoration

Painting: Interior and exterior of classrooms

Construction icone
Installations scolaires

3 new sanitary blocks (Sinks + drinking water)

Construction icone
Equipment, Materials, and Furniture

80 new desk-benches
30 equipment packs: globes...
120 school kits

Project category

Installations

Target learners

420 students

Cost estimation

Under review

Project status

Received

All images of the school

Other construction projects

See all current projects

School image description

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Project details ->
School image description

For the past three years, we have been renting a room and space to house our preschool.
We started with 40 students and now have 80. We serve students in the younger, middle, and older preschool classes, as well as a special education class designed to support children who left public school at a very young age, as well as those facing learning challenges, to help them overcome them.
With our limited resources, we are struggling not only to build our own school but also to accommodate more students.

‍

Project details ->
School image description

The school’s two buildings are unfinished and dilapidated; they have 4 and 2 classrooms, respectively, for a total enrollment of 357 students. There are more than 65 students per class. The desks and benches are broken and insufficient. Three or more students sit on each bench instead of two.

‍