Renovation
Publié le
|
01/06/2025

Classroom Renovation and Construction - EPP Fologo 2

Côte d'Ivoire
|
Quartier Frefredou sud

Introduction

The schoolEPP Fologo 2is located precisely in the villageQuartier Frefredou sudin the city ofBonon. Country : Cote d'Ivoire/West Africa.The school needsRenovationof classrooms, equipments and school infrastructure.

General information
Project applicant
Mr. Junior Kolia
Member - Action For Africa
Contacts
School name

EPP Fologo 2

Location (village, region)
Quartier Frefredou sud
Target beneficiairy
620 élèves
School conditions

The 3 classrooms are unfinished. The roof is in poor condition. The desks and benches are old and worn out. The restrooms are unusable.

Project category

Renovation

Context

The school’s two buildings are unfinished and dilapidated; they have 4 and 2 classrooms, respectively, for a total enrollment of 357 students. There are more than 65 students per class. The desks and benches are broken and insufficient. Three or more students sit on each bench instead of two.

‍

Detailed project description

The classrooms are unfinished, and the roof is damaged and leaks when it rains. The classrooms, designed to accommodate an average of 40 students, are overcrowded, and the school also turned away students at the start of the school year due to lack of space. Completing the two unfinished buildings

—one with four classrooms and the other with two—will boost teachers’ enthusiasm and motivation to share their knowledge and enable students to learn in good conditions. Purchasing new desks and benches will help reduce the shortage of seating in the classrooms, allowing students to sit in pairs during lessons.

‍

Works / Equipment to be provided
Project category

Renovation

Target learners

620 élèves

Cost estimation

29 977 $US Appr. 34 173 780 XOF

Project status

Approved

School Photos

Other construction projects

See all current projects

School image description

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Project details ->
School image description

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Project details ->
School image description

For the past three years, we have been renting a room and space to house our preschool.
We started with 40 students and now have 80. We serve students in the younger, middle, and older preschool classes, as well as a special education class designed to support children who left public school at a very young age, as well as those facing learning challenges, to help them overcome them.
With our limited resources, we are struggling not only to build our own school but also to accommodate more students.

‍

Project details ->