Equipment
Publié le
|
27/10/2026

Renovation and equipments for 16 classrooms – Emmanuel Childrenland school

Nigeria
|
Igbedor

Problem/ Context

We need to complete: Windows, Protectors, doors, benches, desks, chairs, toilets, electrical, solar, library furnitures and equipments. For 16 classrooms and toilets

Detailed project description

We are running our educational project in a very remote area, an island in the river Niger. The level of poverty is very high and the condiction of the population is very stressful because the only means of reaching the nearest town is by boat. Since 2009 we started to run a primary school. We have finished to build the first wing of it which has 5 classrooms, office/ secretariat and infermery. Activities have started on it since 2025. We also completed the second wing of 16 classrooms, toilets, library.We now need support to complete the school and allow children to benefit of safe and conducive environment

‍

Informations générales
Project applicant
Sister Enza Guccione
Superior
Contacts
School name

Emmanuel Childrenland Nursery & Primary School

Location (village, region)
Igbedor
Project category

Renovation

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

1 headteacher’s office
1 multi-purpose hall

‍

Renovation icone
Renovation and Restoration

Doors, windows and security fittings
masonry and flooring
roofing

‍

Construction icone
Installations scolaires

1 electrical/solar system
6 toilet blocks

‍

Construction icone
Equipment, Materials, and Furniture

220 desks and benches
32 sets of teaching materials
18 sets of office furniture and chairs
160 books for the library
40 toys for the nursery
80 school bags and school kits
8 computers, projectors and printers

‍

Main needs

School facilities,School supplies

Target learners

300 children from 2 to 13 years

Coût du projet

To be done

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school

‍

Project details ->
School image description
  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

‍

Project details ->
School image description

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Project details ->