Construction
Publié le
|
09/10/2026

Expansion of 6 new classrooms and Relocation - BRIGHT TRUST ACADEMY

Rwanda
|
Kanyamatembe Village, Kabujenje Cell

Introduction

The schoolBRIGHT TRUST ACADEMYis located precisely in the villageKanyamatembe Village, Kabujenje Cellin the city ofWestern Province, Rutsiro District, Kivumu Sector. Country : Rwanda/East Africa.The school needsConstructionof classrooms, equipments and school infrastructure.

General information
Project applicant
HAKIZIMANA Joel
Owner and Managing Director
Contacts
School name

BRIGHT TRUST ACADEMY

Location (village, region)
Kanyamatembe Village, Kabujenje Cell
Target beneficiairy
251
School conditions

The three classrooms are small. No classroom for the primary school. Lack of sanitary facilities and water. Lack of furniture and teaching materials.

Project category

Construction

Context

BRIGHT TRUST ACADEMY is an existing private school located in Kivumu Sector, Rutsiro District, Western Province, Rwanda.

The school currently provides nursery education to 71 learners using three small classrooms. The existing facilities are insufficient to accommodate additional learners and support the planned expansion into primary education. The school has acquired a new plot of approximately 2,155 square metres in Kanyamatembe Village, Kabujenje Cell, Kivumu Sector.

However, additional financial resources are required to construct classrooms and supporting facilities, provide adequate sanitation, extend the water supply, install electricity and purchase essential school furniture and educational materials. Without additional support, the school will face difficulties expanding its capacity and providing an appropriate learning environment for more children in the surrounding community.

Detailed project description

BRIGHT TRUST ACADEMY SCHOOL Ltd seeks financial or material support from Action For Africa to relocate and expand its existing school in Kivumu Sector, Rutsiro District, Rwanda.

The project proposes the construction of six classrooms, sanitation facilities, a teachers' room, an administration office, a storage room and a library. It also includes extending the water supply pipeline by approximately 700 metres, installing electricity, purchasing student desks and chairs, providing books and teaching materials, and constructing a perimeter fence with an entrance gate.The school currently serves 71 nursery learners and aims to accommodate approximately 180 additional learners, bringing the target enrolment to about 251 children, subject to available capacity and the required authorisations.

The total preliminary estimated project budget is RWF 260,609,822. This estimate covers construction, utilities, furniture, educational resources, transport and a contingency allowance. Final costs will be confirmed through technical assessments and quotations from qualified contractors and service providers.The project aims to improve access to education, create a safer and better-equipped learning environment, and support the planned introduction of primary education for children in the surrounding community.

‍

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

Six (6) classrooms
A staff room and an administrative office,
A storage room and a library
A perimeter fence with an entrance gate.

Construction icone
Installations scolaires

6 blocks of toilets
Extension of the water mains by 700 metres
Electrical installations

‍

Construction icone
Equipment, Materials, and Furniture

180 desks and benches for pupils
230 books and teaching materials

‍

Project category

Construction

Target learners

251

Cost estimation

$176,685 appr. 260,609,822 RWF

Project status

Received

All images of the school

Other construction projects

See all current projects

School image description

Wimagak Primary School currently serves 524 learners, comprising approximately 262 girlsand 262 boys from predominantly low-income households. The school faces severe classroom shortages due to increasing enrolment and the implementation of Kenya's Competency-BasedCurriculum (CBC) and Junior Secondary School (JSS) programme.The school currently has only eight classrooms, four of which are inadequate andovercrowded. PP1 and PP2 learners lack dedicated classrooms, compromising early childhoodlearning outcomes.

Wimagak Primary School currently faces a critical shortage of learning space.
Despite serving 524 learners, the school operates with only eight classrooms. Four of these classrooms are undersized and inadequate, while PP1 and PP2 learners lack proper classrooms entirely.

Project details ->
School image description

Our pupil numbers have increased, and we have been forced to triple the size of the SIL and CP classes, double the size of the CM1 class, and use the parish hall – which is outside the school grounds – for the CM2 class. We therefore wish to plan ahead for the start of the next school year.

Project details ->
School image description

In rural areas around Hargeisa, many children from low-income families face significant barriers to accessing quality education due to the lack of schools, long distances to existing educational facilities, and limited financial resources. As a result, many children are unable to attend school or continue their education. Girls and vulnerable children are particularly affected by these challenges. This project aims to address these problems by building a school that provides accessible, safe, and affordable quality education for children from disadvantaged families. The school will help improve literacy, create equal educational opportunities, and contribute to the long-term development of the local community.

Project details ->