Construction
Publié le
|
13/10/2026

Construction of 3 new classrooms and renovation – Tamaam School

Somaliland
|
M.MOOGE

Problem/ Context

In rural areas around Hargeisa, many children from low-income families face significant barriers to accessing quality education due to the lack of schools, long distances to existing educational facilities, and limited financial resources. As a result, many children are unable to attend school or continue their education. Girls and vulnerable children are particularly affected by these challenges. This project aims to address these problems by building a school that provides accessible, safe, and affordable quality education for children from disadvantaged families. The school will help improve literacy, create equal educational opportunities, and contribute to the long-term development of the local community.

Detailed project description

My project aims to improve the existing school facilities and provide a better learning environment for students.

The proposed project includes the following:

  • Renovation of Existing Schools: Repairing and improving the existing school buildings to provide a safer and more suitable learning environment for students.
  • Construction of Three New Classrooms: Building three additional classrooms to accommodate more students and help address the shortage of classroom space.
  • Improvement of Learning Facilities: Ensuring that the schools have better facilities to support students and their educational needs.

After assessing the needs of the schools and considering the estimated construction costs in my local area, I estimate that the total budget required for this project is approximately US$10,000.

This project aims to build a school in a rural area near Hargeisa, Somaliland, to provide accessible and quality education for children from low-income and disadvantaged families.Many children in rural communities face difficulties accessing education due to the lack of nearby schools, long distances, poverty, and limited educational resources. This project seeks to address these challenges by establishing a safe, inclusive, and child-friendly learning environment.The project will involve constructing school classrooms, providing basic furniture and learning materials, and creating a suitable environment for teaching and learning. The school will aim to serve children who currently have limited access to formal education, with particular attention to vulnerable children and girls.

The project will also seek to recruit qualified teachers and work with parents, community leaders, and local education authorities to support school management and encourage children's enrolment and attendance.The main objectives are to increase access to education, reduce educational inequality, improve literacy and numeracy, and create better opportunities for children from disadvantaged backgrounds.Through this initiative, the project hopes to contribute to the long-term educational and social development of rural communities around Hargeisa. The school will promote equal educational opportunities and help children build a brighter future.

‍

Informations générales
Project applicant
Mohamed Ali Adam
Hargiaa
Contacts
School name

Tamaam School

Location (village, region)
M.MOOGE
Project category

Construction

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

3 new classrooms
Canteen and Infirmary

Renovation icone
Renovation and Restoration

Existing building
- Flooring
- Installation of suspended ceilings
- Roof repairs
- Painting and joinery

Construction icone
Installations scolaires

3 blocks of toilet facilities
Installation of the electrical system

Construction icone
Equipment, Materials, and Furniture

180 desks and benches,
15 sets of teaching materials,
180 school kits

‍

Main needs

New school construction,School expansion : new classrooms,School Renovation

Target learners

180 Childern

Coût du projet

$38,000

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

We need to complete: Windows, Protectors, doors, benches, desks, chairs, toilets, electrical, solar, library furnitures and equipments. For 16 classrooms and toilets

Project details ->
School image description

There are too many pupils in each class, and the classrooms are not yet sufficient, as we only have 14 classrooms but 15 classes, not counting those with over-capacity.

‍

Project details ->
School image description

The pupils in the CI class are housed in a temporary shelter made of straw. There are 55 pupils in total, and they struggle to work properly given the circumstances. During break time, all the pupils go to the village square, which is about 400 metres from the school, to get their breakfast and often return late, hence the need for a school canteen.

Project details ->