Construction of four classrooms – Saint Joseph High school

Madagascar
|
Ambondromisotra

Problem/ Context

There are too many pupils in each class, and the classrooms are not yet sufficient, as we only have 14 classrooms but 15 classes, not counting those with over-capacity.

‍

Detailed project description

So that pupils can learn effectively and in a peaceful environment. And to comply with international standards for classrooms.

Informations générales
Project applicant
Soeur Bakolinirina Aimee Patricia
Directrice du Lycée Saint Joseph
Contacts
School name

Lycee Privée Catholique Saint Joseph

Location (village, region)
Ambondromisotra
Project category

Equipement

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

4 classrooms
1 multi-purpose hall
Canteen + IT room

Renovation icone
Renovation and Restoration

Paintwork, doors and windows
Fountain + 3 toilet blocks

Construction icone
Installations scolaires

1 multi-purpose sports ground

Construction icone
Equipment, Materials, and Furniture

40 tables and benches
30 packs of pre-school toys
25 sets of teaching materials
3 computers + 2 printers

Main needs

Construction d'une école

Target learners

650 élèves

Coût du projet

To be defined

Project status

Received

School Photos

Other construction projects

See all current projects

School image description
  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

‍

Project details ->
School image description

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Project details ->
School image description

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Project details ->