- Roof with holes in some places, allowing rainwater to seep through
- Ceilings detached from their supports
- A dining hall for the cafeteria
- If possible, a CIE meter for the school
- Need for tables and benches
There are too many pupils in each class, and the classrooms are not yet sufficient, as we only have 14 classrooms but 15 classes, not counting those with over-capacity.

So that pupils can learn effectively and in a peaceful environment. And to comply with international standards for classrooms.
Lycee Privée Catholique Saint Joseph
Equipement
4 classrooms
1 multi-purpose hall
Canteen + IT room
Paintwork, doors and windows
Fountain + 3 toilet blocks
1 multi-purpose sports ground
40 tables and benches
30 packs of pre-school toys
25 sets of teaching materials
3 computers + 2 printers
Construction d'une école
650 élèves
To be defined
Received
See all current projects


The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.