Construction of four classrooms – Saint Joseph High school

Madagascar
|
Ambondromisotra

Problem/ Context

There are too many pupils in each class, and the classrooms are not yet sufficient, as we only have 14 classrooms but 15 classes, not counting those with over-capacity.

‍

Detailed project description

So that pupils can learn effectively and in a peaceful environment. And to comply with international standards for classrooms.

Informations générales
Project applicant
Soeur Bakolinirina Aimee Patricia
Directrice du Lycée Saint Joseph
Contacts
School name

Lycee Privée Catholique Saint Joseph

Location (village, region)
Ambondromisotra
Project category

Equipement

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

4 classrooms
1 multi-purpose hall
Canteen + IT room

Renovation icone
Renovation and Restoration

Paintwork, doors and windows
Fountain + 3 toilet blocks

Construction icone
Installations scolaires

1 multi-purpose sports ground

Construction icone
Equipment, Materials, and Furniture

40 tables and benches
30 packs of pre-school toys
25 sets of teaching materials
3 computers + 2 printers

Main needs

Construction d'une école

Target learners

650 élèves

Coût du projet

To be defined

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

TESTIMONI SPECIAL SCHOOLS NGBO LTD is experiencing increasing pressure on its existing classroom facilities as the number of students continues to grow. The school currently serves more than 600 students from JSS1 to SS3, with further admissions expected during the current term.
‍
The existing classroom facilities are not sufficient for the growing student population. Some of the available learning spaces are also below the standard learning environment the school seeks to provide, including classrooms with bare or sandy floors and open-sided conditions.

This shortage of suitable classroom space is becoming an important challenge to the school's ability to provide an adequate and comfortable learning environment for all its students. Without additional classrooms, continued growth in enrollment will place further pressure on the existing facilities.

The school therefore seeks support for the construction of additional permanent classrooms to increase capacity and provide students with a more suitable environment for teaching and learning.

Project details ->
School image description

King’s Glory currently serves 883 learners in Kamuli District, including vulnerable children from families that struggle to meet education needs. The existing learning space is not sufficient for the number of learners being served. Additional classrooms are needed to reduce pressure on the existing facilities and provide a safer and more suitable environment for teaching and learning.

‍

Project details ->
School image description

Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school

‍

Project details ->