Construction
Publié le
|
October 14, 2026

Construction of 3 new classrooms – St Thérèse of the Child Jesus

Cameroon
|
Ngambé-Tikar

Problem/ Context

Our pupil numbers have increased, and we have been forced to triple the size of the SIL and CP classes, double the size of the CM1 class, and use the parish hall – which is outside the school grounds – for the CM2 class. We therefore wish to plan ahead for the start of the next school year.

Detailed project description

The aim here is to provide our primary school with three new classrooms, so that next year we will have three CE1 classes to accommodate the growing number of pupils from the three CP classes, have a classroom for the CM2 class within the school grounds, and triple the size of the CE2 class to prepare for the following year.

This will help to promote good working conditions for our staff, who will not be overwhelmed by the number of pupils per class, and will enable us to ensure a smooth learning experience for the children whose parents place their trust in us.

Furthermore, all our classrooms will be located within the same compound. According to the available quotes, the construction of a single classroom costs 7,500,000 FCFA, as we are situated some distance from the urban areas where materials are sourced. We would be most grateful if you could fund the construction of these three classrooms.

‍

Informations générales
Project applicant
Père Ndong Ndzana Henri Steve, Cssp.
Contacts
Gestionnaire de l'école
School name

Ste Thérèse de l'enfant Jésus

Location (village, region)
Ngambé-Tikar
Project category

Construction

Main needs

Extension: 3 new classrooms + administrative building

Target learners

200 children

Coût du projet

32 500 000 FCFA ≈ $55,449

Project status

Received

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

3 new classrooms
A fully equipped administrative building
A multi-purpose hall

‍

Renovation icone
Renovation and Restoration

Painting

‍

Construction icone
Installations scolaires

School playground improvements
Water fountain
Play area

‍

Construction icone
Equipment, Materials, and Furniture

120 desks and benches
40 sets of teaching materials
50 school kits

‍

School Photos

Toutes les autres écoles

Retrouvez toutes les candidatures transmises par les villages

  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

‍

Voir l'école

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Voir l'école

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Voir l'école