Construction of 2 Classrooms at Muthara Progressive Academy

Kenya
|
Inoi

Problem/ Context

Muthara Progressive Academy in rural Kirinyaga County serves approximately 360 vulnerable children from low-income households. The school currently relies on temporary wooden classrooms that provide inadequate protection against heavy rainfall, dampness and cold weather. During rainy and cold seasons, these conditions make classrooms uncomfortable, disrupt learning and raise concerns about children's health and wellbeing. Due to limited financial resources, the school cannot replace all the wooden structures at once. It therefore seeks support to construct two permanent classrooms as the first phase of a gradual programme to provide safe, durable and child-friendly learning environments.

‍

Detailed project description

Muthara Progressive Academy, located in rural Kirinyaga County, Kenya, seeks financial support of €16,000 to construct two permanent classrooms to improve learning conditions for 360 vulnerable children from low-income households.

Currently, the school relies on temporary wooden classrooms that provide inadequate protection against heavy rainfall, dampness and cold weather. During rainy and cold seasons, the classrooms become uncomfortable for learners, disrupting lessons and raising concerns about children's health, safety and wellbeing. The school has limited financial resources and cannot replace all its temporary structures at once. It therefore proposes a phased infrastructure improvement programme, beginning with the construction of two permanent classrooms.

Project objectives

Construct two durable, permanent classrooms to replace two existing temporary wooden classrooms.

Provide safe, comfortable and weather-resistant learning spaces that protect children against rain, dampness and cold conditions.

Improve the learning environment, concentration, attendance and general wellbeing of vulnerable learners.

Strengthen the school's educational infrastructure and establish a foundation for gradually replacing the remaining wooden classrooms.

Materials and construction activities

The project will use locally available, durable construction materials, including:

Building stones or suitable masonry blocks for permanent walls.

Cement, sand, ballast and hardcore for foundations and concrete works.

Reinforcement steel where required by the structural design.

Roofing timber or steel supports and durable iron sheets.

Cement and other materials for strong, smooth classroom floors.

Doors, window frames, glass panes and secure fittings.

Plastering materials, paint and other finishing materials.

Plumbing or electrical fittings where required by the approved classroom design.

Construction activities will include site preparation, foundation excavation, construction of walls, roofing, installation of doors and windows, flooring, plastering, painting and final inspection.

Expected results

By the end of the three-month implementation period, the project expects to achieve the following:

Two fully completed permanent classrooms.

Replacement of two vulnerable temporary wooden classroom structures.

Improved learning conditions for approximately 360 children.

Better protection against rainfall, dampness and cold weather.

A safer, more comfortable and conducive environment for teaching and learning.

Improved school infrastructure that can serve present and future generations of learners.

Sustainability

The school management will take responsibility for maintaining the completed classrooms through regular inspections, cleaning and timely repairs. Parents and community members will be encouraged to support the maintenance of the facilities. The two classrooms will form the first phase of a long-term plan to gradually replace all temporary wooden classrooms as additional funding becomes available.

The total project budget is €16,000, covering construction materials, skilled and casual labour, transportation and related construction costs. Muthara Progressive Academy respectfully seeks Action For Africa's support to make this important improvement possible and provide vulnerable rural children with safer and better learning facilities.

‍

Informations générales
Project applicant
Mercy Nyakeyo Murithi
school administror
Contacts
School name

Muthara progressive Academy

Location (village, region)
Inoi
School conditions

The classrooms are made of wood There is no school building Rainwater leaks into the classrooms There is a lack of school infrastructure

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

6 classrooms
1 administration building
1 multipurpose room

Construction icone
Installations scolaires

6 toilet blocks
1 water fountain

Construction icone
Equipment, Materials, and Furniture

130 desks and benches
30 sets of teaching materials
Office furniture and chairs
3 computers and 2 printers

Project category

Construction

Target learners

360

Coût du projet

€16,000 (

Project status

Received

Other construction projects

See all current projects

School image description

MU RUGO RUGALI GARILEA serves 143 children in a community where the school seeks to contribute to access to early childhood and primary education. Although the school has classrooms and a team of teachers and support staff, its infrastructure remains limited.Five of the seven existing classrooms are old and all seven are not enough to receive all the available customers where 77 pending children in this first term 2026 have not yet been registered.

The school also lacks a dedicated library, a suitable kitchen building and a dining hall. In addition, the school seeks a perimeter fence to define the school boundary and improve the management and security of the compound.

The school intends to extend its educational provision to Primary Five and Primary Six next academic year 2027-2028, subject to the required authorization but right now an urgent need is on expanding baby class and Primary one where we have ready children but no classes to put them in. Additional classroom space is therefore a priority. A library would give children greater access to storybooks and reference materials. A dedicated kitchen and dining hall would help organise meal preparation and pupils' meals more appropriately.

The school needs additional classrooms to support its planned expansion to find where to put received client in this first term that started on 07/09/2026 where we had 220 children but we managed to accommodate 143 only, others are still not registered and are willing to come any time we get two at least two classes to put them in. It also needs a library to encourage reading, a kitchen for food preparation, a dining hall for pupils' meals, and a perimeter fence to help define and secure the school compound.

Project details ->
School image description

Wimagak Primary School currently serves 524 learners, comprising approximately 262 girlsand 262 boys from predominantly low-income households. The school faces severe classroom shortages due to increasing enrolment and the implementation of Kenya's Competency-BasedCurriculum (CBC) and Junior Secondary School (JSS) programme.The school currently has only eight classrooms, four of which are inadequate andovercrowded. PP1 and PP2 learners lack dedicated classrooms, compromising early childhoodlearning outcomes.

Wimagak Primary School currently faces a critical shortage of learning space.
Despite serving 524 learners, the school operates with only eight classrooms. Four of these classrooms are undersized and inadequate, while PP1 and PP2 learners lack proper classrooms entirely.

Project details ->
School image description

Our pupil numbers have increased, and we have been forced to triple the size of the SIL and CP classes, double the size of the CM1 class, and use the parish hall – which is outside the school grounds – for the CM2 class. We therefore wish to plan ahead for the start of the next school year.

Project details ->