Muthara Progressive Academy in rural Kirinyaga County serves approximately 360 vulnerable children from low-income households. The school currently relies on temporary wooden classrooms that provide inadequate protection against heavy rainfall, dampness and cold weather. During rainy and cold seasons, these conditions make classrooms uncomfortable, disrupt learning and raise concerns about children's health and wellbeing. Due to limited financial resources, the school cannot replace all the wooden structures at once. It therefore seeks support to construct two permanent classrooms as the first phase of a gradual programme to provide safe, durable and child-friendly learning environments.

‍

Detailed project description

Muthara Progressive Academy, located in rural Kirinyaga County, Kenya, seeks financial support of €16,000 to construct two permanent classrooms to improve learning conditions for 360 vulnerable children from low-income households.

Currently, the school relies on temporary wooden classrooms that provide inadequate protection against heavy rainfall, dampness and cold weather. During rainy and cold seasons, the classrooms become uncomfortable for learners, disrupting lessons and raising concerns about children's health, safety and wellbeing. The school has limited financial resources and cannot replace all its temporary structures at once. It therefore proposes a phased infrastructure improvement programme, beginning with the construction of two permanent classrooms.

Project objectives

Construct two durable, permanent classrooms to replace two existing temporary wooden classrooms.

Provide safe, comfortable and weather-resistant learning spaces that protect children against rain, dampness and cold conditions.

Improve the learning environment, concentration, attendance and general wellbeing of vulnerable learners.

Strengthen the school's educational infrastructure and establish a foundation for gradually replacing the remaining wooden classrooms.

Materials and construction activities

The project will use locally available, durable construction materials, including:

Building stones or suitable masonry blocks for permanent walls.

Cement, sand, ballast and hardcore for foundations and concrete works.

Reinforcement steel where required by the structural design.

Roofing timber or steel supports and durable iron sheets.

Cement and other materials for strong, smooth classroom floors.

Doors, window frames, glass panes and secure fittings.

Plastering materials, paint and other finishing materials.

Plumbing or electrical fittings where required by the approved classroom design.

Construction activities will include site preparation, foundation excavation, construction of walls, roofing, installation of doors and windows, flooring, plastering, painting and final inspection.

Expected results

By the end of the three-month implementation period, the project expects to achieve the following:

Two fully completed permanent classrooms.

Replacement of two vulnerable temporary wooden classroom structures.

Improved learning conditions for approximately 360 children.

Better protection against rainfall, dampness and cold weather.

A safer, more comfortable and conducive environment for teaching and learning.

Improved school infrastructure that can serve present and future generations of learners.

Sustainability

The school management will take responsibility for maintaining the completed classrooms through regular inspections, cleaning and timely repairs. Parents and community members will be encouraged to support the maintenance of the facilities. The two classrooms will form the first phase of a long-term plan to gradually replace all temporary wooden classrooms as additional funding becomes available.

The total project budget is €16,000, covering construction materials, skilled and casual labour, transportation and related construction costs. Muthara Progressive Academy respectfully seeks Action For Africa's support to make this important improvement possible and provide vulnerable rural children with safer and better learning facilities.

‍

Informations générales
Project applicant
Mercy Nyakeyo Murithi
school administror
Contacts
School name

Muthara progressive Academy

Location (village, region)
Inoi
School conditions

The classrooms are made of wood There is no school building Rainwater leaks into the classrooms There is a lack of school infrastructure

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

6 classrooms
1 administration building
1 multipurpose room

Construction icone
Installations scolaires

6 toilet blocks
1 water fountain

Construction icone
Equipment, Materials, and Furniture

130 desks and benches
30 sets of teaching materials
Office furniture and chairs
3 computers and 2 printers

Project category

Construction

Target learners

360

Coût du projet

€16,000 (

Project status

Received

Other construction projects

See all current projects

School image description

Botolon Bright Future Academy is a community-established educational institution located in Gidole, Gardulla Zone, Southern Ethiopia. The school was established through the initiative and commitment of the local community to provide educational opportunities for children and contribute to sustainable community development. However, the school is facing serious challenges due to inadequate educational infrastructure. It does not have sufficient classrooms to accommodate its students and also lacks essential facilities, including a dining hall, library, adequate toilet facilities, and a staff room. These shortages negatively affect the teaching and learning environment, student participation, and the overall quality of education. Therefore, the construction of four additional classrooms is urgently needed to address the existing infrastructure gap.

Project details ->
School image description

St Mary Magdalene Pre- and Primary School is situated in East Pokot, Tiaty Sub-County, Baringo County, Kenya.  The school was establish by Catholic religious sisters to serve the community around.The school serves children from a marginalized community where many families experience poverty, economic hardship and limited access to essential social services.
Children in this region face various challenges that affect their access to quality education. These include limited educational infrastructure, inadequate learning facilities, difficult living conditions and the economic vulnerability of many households.
One of the major challenges facing the school is the shortage of adequate and appropriate infrastructure to support effective teaching and learning. The existing facilities are not sufficient to meet the school's needs currently we have only one classroom for grade one only nexty year 2027 we will grade four learners, we are lacking three classrooms for grade 2,3,and 4 we have been sharing with pp1 and pp2 classrooms and many a time the teachers are forced to have their lessons under the trees, making it necessary to expand and improve the available infrastructure.
The school urgently requires three additional classrooms to provide adequate and conducive learning spaces for the learners. It also needs an administration block to facilitate effective school management, coordination of educational activities and proper record keeping.
Furthermore, the lack of adequate sanitation facilities poses a challenge to the health, hygiene, dignity and general well-being of the children. The construction of six toilets will help provide a safer, cleaner and more hygienic school environment.
Without additional support, the school faces difficulties in improving its infrastructure and providing an environment that meets the educational and basic sanitation needs of the children.
Considering the vulnerability of the community and the importance of education in transforming children's lives, there is an urgent need for support to improve the school's infrastructure.
Through this project, St Mary Magdalene Pre- and Primary School seeks partnership and assistance from Action for Africa for the above mentioned needs to address these challenges and create a safe, inclusive and supportive learning environment for children in East Pokot.

Project details ->
School image description

The classrooms are unfinished and not enough.The grounds is unfinished We lack qualified teachers We require solar powered electricity

Project details ->