
The school have temporary buildings which built by wooden structures and the class rooms aren’t enough. Inadequate classroom equipments like furniture desks, toilet, sanitation equipments (water)
The schoolBaptist Hillview schoolis located precisely in the villageNamunyiri,Nzoia ward and Likuyani constituencyin the city ofNairobi. Country : Kenya/East Africa.The school needsConstructionof classrooms, equipments and school infrastructure.
Baptist Hillview school
Temporary corrugated iron classrooms No permanent classrooms Outdated infrastructure Lack of rain protection Overcrowded classrooms
Construction
Baptist Hillview School faces several challenges that affect the quality of education and the learning environment for its pupils. The school currently serves 203 pupils but has inadequate permanent classroom facilities to accommodate all learners comfortably. The existing classrooms are temporary and have poor infrastructure, including muddy floors and inadequate protection against harsh weather conditions such as heavy rains, strong winds, and excessive heat. These conditions make teaching and learning difficult, especially during the rainy season.
The shortage of classrooms also creates space constraints, making it difficult for teachers to organize lessons effectively and provide learners with a comfortable learning environment.
The school also faces financial challenges and lacks sufficient resources to construct permanent classrooms and improve its facilities. Limited external support has made it difficult to address these infrastructure needs.
To overcome these challenges, Baptist Hillview School urgently requires financial support to construct 10 permanent classrooms. This will provide a safer, cleaner, and more conducive learning environment, improve teaching and learning conditions, and support the educational development of the 203 pupils.


PROJECT TITLE: CONSTRUCTION OF 10 PERMANENT CLASSROOMS AT BAPTIST HILLVIEW SCHOOL
1. PROJECT DESCRIPTION AND CURRENT BUILDING SITUATION
Baptist Hillview School is a private non-profit project school located in Namunyiri, Nzoia Ward, Kakamega County, Kenya. The school was registered on 7 September 2016 and currently serves approximately 203 pupils, supported by 17 teachers and support staff.
The school is facing serious challenges due to inadequate and unsuitable classroom facilities. The existing classrooms are temporary structures that do not provide a safe, comfortable and conducive learning environment. Some classrooms have muddy floors, weak walls and inadequate protection against rain, wind and other harsh weather conditions.
During rainy seasons, the classrooms become muddy and uncomfortable, making teaching and learning difficult. Limited classroom space also causes congestion and affects pupils' concentration and academic performance.
The school owns the land on which it operates, but the existing facilities are insufficient to meet the educational needs of the growing community.
The proposed project aims to construct 10 permanent classrooms to replace inadequate learning structures and provide a safe, clean and comfortable environment for pupils and teachers.
2. PROJECT OBJECTIVES
The project aims to:
1. Construct 10 permanent and durable classrooms.
2. Replace temporary and unsuitable learning structures.
3. Provide a safe, clean and comfortable learning environment.
4. Reduce classroom congestion and improve learning conditions.
5. Protect pupils and teachers from harsh weather conditions.
6. Improve the quality of teaching and learning.
7. Increase the school's capacity to accommodate more children.
8. Promote access to quality education for children in the surrounding community.
3. MATERIALS REQUIRED
The construction project will require the following materials:
- Cement for foundations, floors, plastering and construction.
- Building stones or suitable building blocks.
- Sand and ballast.
- Reinforcement steel bars.
- Roofing timber and treated structural timber.
- Roofing iron sheets.
- Roofing nails and ordinary construction nails.
- Doors and window frames.
- Glass panes and window fittings.
- Paint for internal and external finishing.
- Floor finishing materials.
- Electrical wiring and lighting fixtures.
- Locks and security fittings.
- Construction tools and equipment.
- Skilled and unskilled labour.
- Professional construction supervision.
4. EXPECTED RESULTS
Upon completion of the project, the school expects to achieve the following results:
1. Ten permanent classrooms will be constructed and ready for use.
2. Approximately 203 pupils will benefit from improved learning facilities.
3. Pupils will have access to safer and more comfortable classrooms.
4. Muddy and unsuitable learning conditions will be eliminated in the new classrooms.
5. Classroom congestion will be reduced.
6. Teachers will have a better working environment.
7. More children from the surrounding community will have an opportunity to access education.
8. The school will have improved infrastructure and increased capacity to serve future generations.
5. PROJECT BENEFICIARIES
The direct beneficiaries will include:
- 203 pupils currently enrolled at Baptist Hillview School.
- 17 teachers and support staff.
- Children from Namunyiri and neighbouring communities.
- Parents and guardians.
- Future generations of pupils joining the school.
6. FUNDING REQUIRED
The total funding requested for this project is KSh 15,000,000 (Fifteen Million Kenyan Shillings).
The funds will be used for the construction of 10 permanent classrooms, including purchasing construction materials, paying skilled and unskilled labour, and meeting other necessary construction expenses.
The school welcomes full funding or partial classroom sponsorship from individual donors, charitable foundations, organizations, companies and well-wishers.
7. PROJECT SUSTAINABILITY
Baptist Hillview School owns the land where the construction will take place. The school management will take responsibility for maintaining the completed classrooms, ensuring proper use of the facilities and keeping the learning environment clean and safe.
The school will also mobilize support from parents, community members, well-wishers and development partners to support maintenance and future improvements.
OUR VISION
To provide every child with a safe, dignified and supportive learning environment where they can learn, grow and build a better future through quality education.


10 permanent classrooms
1 administration building
1 school fence and gate
1 multipurpose room
Painting and carpentry
Doors and windows
Roof waterproofing and repair
Flooring
1 borehole/drinking water system
1 electrical/solar installation
70 desks and benches
15 sets of office furniture
35 sets of teaching materials
4 computers and 2 printers
Construction
203 pupils and 17 teachers
To be estimated
Received
See all current projects

The school have temporary buildings which built by wooden structures and the class rooms aren’t enough. Inadequate classroom equipments like furniture desks, toilet, sanitation equipments (water)

MU RUGO RUGALI GARILEA serves 143 children in a community where the school seeks to contribute to access to early childhood and primary education. Although the school has classrooms and a team of teachers and support staff, its infrastructure remains limited.Five of the seven existing classrooms are old and all seven are not enough to receive all the available customers where 77 pending children in this first term 2026 have not yet been registered.
The school also lacks a dedicated library, a suitable kitchen building and a dining hall. In addition, the school seeks a perimeter fence to define the school boundary and improve the management and security of the compound.
The school intends to extend its educational provision to Primary Five and Primary Six next academic year 2027-2028, subject to the required authorization but right now an urgent need is on expanding baby class and Primary one where we have ready children but no classes to put them in. Additional classroom space is therefore a priority. A library would give children greater access to storybooks and reference materials. A dedicated kitchen and dining hall would help organise meal preparation and pupils' meals more appropriately.
The school needs additional classrooms to support its planned expansion to find where to put received client in this first term that started on 07/09/2026 where we had 220 children but we managed to accommodate 143 only, others are still not registered and are willing to come any time we get two at least two classes to put them in. It also needs a library to encourage reading, a kitchen for food preparation, a dining hall for pupils' meals, and a perimeter fence to help define and secure the school compound.

Wimagak Primary School currently serves 524 learners, comprising approximately 262 girlsand 262 boys from predominantly low-income households. The school faces severe classroom shortages due to increasing enrolment and the implementation of Kenya's Competency-BasedCurriculum (CBC) and Junior Secondary School (JSS) programme.The school currently has only eight classrooms, four of which are inadequate andovercrowded. PP1 and PP2 learners lack dedicated classrooms, compromising early childhoodlearning outcomes.
Wimagak Primary School currently faces a critical shortage of learning space.
Despite serving 524 learners, the school operates with only eight classrooms. Four of these classrooms are undersized and inadequate, while PP1 and PP2 learners lack proper classrooms entirely.