Building of Ten Classrooms - Baptist Hillview School

Kenya
|
Namunyiri,Nzoia ward and Likuyani constituency

Introduction

The schoolBaptist Hillview schoolis located precisely in the villageNamunyiri,Nzoia ward and Likuyani constituencyin the city ofNairobi. Country : Kenya/East Africa.The school needsConstructionof classrooms, equipments and school infrastructure.

General information
Project applicant
Peter Musau
School Director
Contacts
School name

Baptist Hillview school

Location (village, region)
Namunyiri,Nzoia ward and Likuyani constituency
Target beneficiairy
203 pupils and 17 teachers
School conditions

Temporary corrugated iron classrooms No permanent classrooms Outdated infrastructure Lack of rain protection Overcrowded classrooms

Project category

Construction

Context

Baptist Hillview School faces several challenges that affect the quality of education and the learning environment for its pupils. The school currently serves 203 pupils but has inadequate permanent classroom facilities to accommodate all learners comfortably. The existing classrooms are temporary and have poor infrastructure, including muddy floors and inadequate protection against harsh weather conditions such as heavy rains, strong winds, and excessive heat. These conditions make teaching and learning difficult, especially during the rainy season.

The shortage of classrooms also creates space constraints, making it difficult for teachers to organize lessons effectively and provide learners with a comfortable learning environment.

The school also faces financial challenges and lacks sufficient resources to construct permanent classrooms and improve its facilities. Limited external support has made it difficult to address these infrastructure needs.

To overcome these challenges, Baptist Hillview School urgently requires financial support to construct 10 permanent classrooms. This will provide a safer, cleaner, and more conducive learning environment, improve teaching and learning conditions, and support the educational development of the 203 pupils.

‍

Logo Action For Africa

Detailed project description

PROJECT TITLE: CONSTRUCTION OF 10 PERMANENT CLASSROOMS AT BAPTIST HILLVIEW SCHOOL

1. PROJECT DESCRIPTION AND CURRENT BUILDING SITUATION

Baptist Hillview School is a private non-profit project school located in Namunyiri, Nzoia Ward, Kakamega County, Kenya. The school was registered on 7 September 2016 and currently serves approximately 203 pupils, supported by 17 teachers and support staff.

The school is facing serious challenges due to inadequate and unsuitable classroom facilities. The existing classrooms are temporary structures that do not provide a safe, comfortable and conducive learning environment. Some classrooms have muddy floors, weak walls and inadequate protection against rain, wind and other harsh weather conditions.

During rainy seasons, the classrooms become muddy and uncomfortable, making teaching and learning difficult. Limited classroom space also causes congestion and affects pupils' concentration and academic performance.

The school owns the land on which it operates, but the existing facilities are insufficient to meet the educational needs of the growing community.

The proposed project aims to construct 10 permanent classrooms to replace inadequate learning structures and provide a safe, clean and comfortable environment for pupils and teachers.

2. PROJECT OBJECTIVES

The project aims to:

1. Construct 10 permanent and durable classrooms.
2. Replace temporary and unsuitable learning structures.
3. Provide a safe, clean and comfortable learning environment.
4. Reduce classroom congestion and improve learning conditions.
5. Protect pupils and teachers from harsh weather conditions.
6. Improve the quality of teaching and learning.
7. Increase the school's capacity to accommodate more children.
8. Promote access to quality education for children in the surrounding community.

3. MATERIALS REQUIRED

The construction project will require the following materials:

- Cement for foundations, floors, plastering and construction.
- Building stones or suitable building blocks.
- Sand and ballast.
- Reinforcement steel bars.
- Roofing timber and treated structural timber.
- Roofing iron sheets.
- Roofing nails and ordinary construction nails.
- Doors and window frames.
- Glass panes and window fittings.
- Paint for internal and external finishing.
- Floor finishing materials.
- Electrical wiring and lighting fixtures.
- Locks and security fittings.
- Construction tools and equipment.
- Skilled and unskilled labour.
- Professional construction supervision.

4. EXPECTED RESULTS

Upon completion of the project, the school expects to achieve the following results:

1. Ten permanent classrooms will be constructed and ready for use.
2. Approximately 203 pupils will benefit from improved learning facilities.
3. Pupils will have access to safer and more comfortable classrooms.
4. Muddy and unsuitable learning conditions will be eliminated in the new classrooms.
5. Classroom congestion will be reduced.
6. Teachers will have a better working environment.
7. More children from the surrounding community will have an opportunity to access education.
8. The school will have improved infrastructure and increased capacity to serve future generations.

5. PROJECT BENEFICIARIES

The direct beneficiaries will include:

- 203 pupils currently enrolled at Baptist Hillview School.
- 17 teachers and support staff.
- Children from Namunyiri and neighbouring communities.
- Parents and guardians.
- Future generations of pupils joining the school.

6. FUNDING REQUIRED

The total funding requested for this project is KSh 15,000,000 (Fifteen Million Kenyan Shillings).

The funds will be used for the construction of 10 permanent classrooms, including purchasing construction materials, paying skilled and unskilled labour, and meeting other necessary construction expenses.

The school welcomes full funding or partial classroom sponsorship from individual donors, charitable foundations, organizations, companies and well-wishers.

7. PROJECT SUSTAINABILITY

Baptist Hillview School owns the land where the construction will take place. The school management will take responsibility for maintaining the completed classrooms, ensuring proper use of the facilities and keeping the learning environment clean and safe.

The school will also mobilize support from parents, community members, well-wishers and development partners to support maintenance and future improvements.

OUR VISION

To provide every child with a safe, dignified and supportive learning environment where they can learn, grow and build a better future through quality education.

Logo Action For Africa
Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

10 permanent classrooms
1 administration building
1 school fence and gate
1 multipurpose room

Renovation icone
Renovation and Restoration

Painting and carpentry
Doors and windows
Roof waterproofing and repair
Flooring

Construction icone
Installations scolaires

1 borehole/drinking water system
1 electrical/solar installation

Construction icone
Equipment, Materials, and Furniture

70 desks and benches
15 sets of office furniture
35 sets of teaching materials
4 computers and 2 printers

Project category

Construction

Target learners

203 pupils and 17 teachers

Cost estimation

To be estimated

Project status

Received

All images of the school

Other construction projects

See all current projects

School image description

Our pupil numbers have increased, and we have been forced to triple the size of the SIL and CP classes, double the size of the CM1 class, and use the parish hall – which is outside the school grounds – for the CM2 class. We therefore wish to plan ahead for the start of the next school year.

Project details ->
School image description

In rural areas around Hargeisa, many children from low-income families face significant barriers to accessing quality education due to the lack of schools, long distances to existing educational facilities, and limited financial resources. As a result, many children are unable to attend school or continue their education. Girls and vulnerable children are particularly affected by these challenges. This project aims to address these problems by building a school that provides accessible, safe, and affordable quality education for children from disadvantaged families. The school will help improve literacy, create equal educational opportunities, and contribute to the long-term development of the local community.

Project details ->
School image description

Kins Favour Academy, located in Dagoretti North Sub-County, Nairobi County, Kenya, was established in August 2009 with just one learner and has grown to approximately 405 learners, from Kindergarten to Junior Nine.However, the school’s growth has created a significant need for adequate and permanent learning facilities. Many learners currently study in temporary classrooms, which do not provide the long-term, stable learning environment required by a growing school. Limited financial resources have made it difficult to complete the remaining construction works. Without additional support, the school will continue facing challenges in providing adequate, durable learning spaces for its growing number of learners.

Project details ->