Renovation of Kennedy 2 School in Daloa

Côte d'Ivoire
|
Quartier Kennedy 2

Introduction

The schoolKennedy 2 Preschool in Daloais located precisely in the villageQuartier Kennedy 2in the city ofDaloa. Country : Cote d'Ivoire/West Africa.The school needsEquipementof classrooms, equipments and school infrastructure.

General information
Project applicant
Mrs. NADIE ROSE BAGOU
School Director
Contacts
School name

Kennedy 2 Preschool in Daloa

Location (village, region)
Quartier Kennedy 2
Target beneficiairy
200
School conditions

Classrooms are overcrowded (+60) Unrenovated buildings Lack of preschool materials Lack of school supplies

Project category

Equipement

Context

ESTABLISHED in 2000. I have been running this school for three years now. But there are no amenities for these students. Under the previous principal, enrollment was at a maximum of 90 students. When I arrived, after giving the school a few coats of paint, I had 120 students in the first year, then 180, and 187 this year.

‍

Detailed project description

We have 4 buildings, 3 classrooms, and a principal’s office, so we need to build 2 more classrooms. In 2024, we’ll have 180 students. Small tables and chairs: 100; swing set: none; playground equipment: none; restrooms without doors for either students or teachers; we need 2 restrooms for students and teachers.

Buildings to be renovated: 3 classrooms

-Painting, tiling, ceilings

-Electrical work in these rooms, plumbing, carpentry, cafeteria, playroom, and school supplies for underprivileged students.

These are the key needs. The immediate need that is most important to us is doors, tiling, and plastering for the 3 classrooms in time for the start of the school year. At the very least, the doors and tiling.

We are also requesting assistance with school supplies such as: mats, markers, slates, chalk, colored pencils, reams of paper, scissors, and all types of glue.

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

2 new classrooms
School cafeteria

Renovation icone
Renovation and Restoration

Painting and carpentry work
Tile and ceiling installation

Construction icone
Installations scolaires

4 Toilet blocks + Sinks

Construction icone
Equipment, Materials, and Furniture

100 small tables and chairs
Swings and playground equipment
School supply kits

Project category

Equipement

Target learners

200

Cost estimation

17 280 $ US Appr. 9 849 600 XOF

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

The Konankro State Primary School (EPP), situated in the Bodokro sub-prefecture in the Gbêkê region of Côte d’Ivoire, has around 120 pupils. Despite its vital role in the education of local children, the school requires additional facilities to improve learning conditions and meet the needs of its pupil population. The lack of sufficient classrooms limits the school’s ability to accommodate pupils in suitable conditions.

Furthermore, the shortage of suitable accommodation for teachers makes it more difficult for them to settle in the area and may jeopardise their long-term commitment to the school. In light of this situation, the construction of three additional classrooms and two staff flats is a pressing priority. The completion of these facilities would help to improve the school environment, facilitate the work of teachers and provide pupils with better conditions in which to learn and succeed.

Project details ->
School image description

The school have temporary buildings which built by wooden structures and the class rooms aren’t enough. Inadequate classroom equipments like furniture desks, toilet, sanitation equipments (water)

‍

Project details ->
School image description

MU RUGO RUGALI GARILEA serves 143 children in a community where the school seeks to contribute to access to early childhood and primary education. Although the school has classrooms and a team of teachers and support staff, its infrastructure remains limited.Five of the seven existing classrooms are old and all seven are not enough to receive all the available customers where 77 pending children in this first term 2026 have not yet been registered.

The school also lacks a dedicated library, a suitable kitchen building and a dining hall. In addition, the school seeks a perimeter fence to define the school boundary and improve the management and security of the compound.

The school intends to extend its educational provision to Primary Five and Primary Six next academic year 2027-2028, subject to the required authorization but right now an urgent need is on expanding baby class and Primary one where we have ready children but no classes to put them in. Additional classroom space is therefore a priority. A library would give children greater access to storybooks and reference materials. A dedicated kitchen and dining hall would help organise meal preparation and pupils' meals more appropriately.

The school needs additional classrooms to support its planned expansion to find where to put received client in this first term that started on 07/09/2026 where we had 220 children but we managed to accommodate 143 only, others are still not registered and are willing to come any time we get two at least two classes to put them in. It also needs a library to encourage reading, a kitchen for food preparation, a dining hall for pupils' meals, and a perimeter fence to help define and secure the school compound.

Project details ->