Equipment
Publié le
|
09/08/2026

Renovation of Kennedy 2 School in Daloa

Côte d'Ivoire
|
Quartier Kennedy 2

Introduction

The schoolKennedy 2 Preschool in Daloais located precisely in the villageQuartier Kennedy 2in the city ofDaloa. Country : Cote d'Ivoire/West Africa.The school needsEquipementof classrooms, equipments and school infrastructure.

General information
Project applicant
Mrs. NADIE ROSE BAGOU
School Director
Contacts
School name

Kennedy 2 Preschool in Daloa

Location (village, region)
Quartier Kennedy 2
Target beneficiairy
200
School conditions

Classrooms are overcrowded (+60) Unrenovated buildings Lack of preschool materials Lack of school supplies

Project category

Equipement

Context

ESTABLISHED in 2000. I have been running this school for three years now. But there are no amenities for these students. Under the previous principal, enrollment was at a maximum of 90 students. When I arrived, after giving the school a few coats of paint, I had 120 students in the first year, then 180, and 187 this year.

‍

Detailed project description

We have 4 buildings, 3 classrooms, and a principal’s office, so we need to build 2 more classrooms. In 2024, we’ll have 180 students. Small tables and chairs: 100; swing set: none; playground equipment: none; restrooms without doors for either students or teachers; we need 2 restrooms for students and teachers.

Buildings to be renovated: 3 classrooms

-Painting, tiling, ceilings

-Electrical work in these rooms, plumbing, carpentry, cafeteria, playroom, and school supplies for underprivileged students.

These are the key needs. The immediate need that is most important to us is doors, tiling, and plastering for the 3 classrooms in time for the start of the school year. At the very least, the doors and tiling.

We are also requesting assistance with school supplies such as: mats, markers, slates, chalk, colored pencils, reams of paper, scissors, and all types of glue.

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

2 new classrooms
School cafeteria

Renovation icone
Renovation and Restoration

Painting and carpentry work
Tile and ceiling installation

Construction icone
Installations scolaires

4 Toilet blocks + Sinks

Construction icone
Equipment, Materials, and Furniture

100 small tables and chairs
Swings and playground equipment
School supply kits

Project category

Equipement

Target learners

200

Cost estimation

17 280 $ US Appr. 9 849 600 XOF

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

We need to complete: Windows, Protectors, doors, benches, desks, chairs, toilets, electrical, solar, library furnitures and equipments. For 16 classrooms and toilets

Project details ->
School image description

There are too many pupils in each class, and the classrooms are not yet sufficient, as we only have 14 classrooms but 15 classes, not counting those with over-capacity.

‍

Project details ->
School image description

The pupils in the CI class are housed in a temporary shelter made of straw. There are 55 pupils in total, and they struggle to work properly given the circumstances. During break time, all the pupils go to the village square, which is about 400 metres from the school, to get their breakfast and often return late, hence the need for a school canteen.

Project details ->