Equipment
Publié le
|
09/08/2026

Renovation of Kennedy 2 School in Daloa

Côte d'Ivoire
|
Quartier Kennedy 2

Introduction

The schoolKennedy 2 Preschool in Daloais located precisely in the villageQuartier Kennedy 2in the city ofDaloa. Country : Cote d'Ivoire/West Africa.The school needsEquipementof classrooms, equipments and school infrastructure.

General information
Project applicant
Mrs. NADIE ROSE BAGOU
School Director
Contacts
School name

Kennedy 2 Preschool in Daloa

Location (village, region)
Quartier Kennedy 2
Target beneficiairy
200
School conditions

Classrooms are overcrowded (+60) Unrenovated buildings Lack of preschool materials Lack of school supplies

Project category

Equipement

Context

ESTABLISHED in 2000. I have been running this school for three years now. But there are no amenities for these students. Under the previous principal, enrollment was at a maximum of 90 students. When I arrived, after giving the school a few coats of paint, I had 120 students in the first year, then 180, and 187 this year.

‍

Detailed project description

We have 4 buildings, 3 classrooms, and a principal’s office, so we need to build 2 more classrooms. In 2024, we’ll have 180 students. Small tables and chairs: 100; swing set: none; playground equipment: none; restrooms without doors for either students or teachers; we need 2 restrooms for students and teachers.

Buildings to be renovated: 3 classrooms

-Painting, tiling, ceilings

-Electrical work in these rooms, plumbing, carpentry, cafeteria, playroom, and school supplies for underprivileged students.

These are the key needs. The immediate need that is most important to us is doors, tiling, and plastering for the 3 classrooms in time for the start of the school year. At the very least, the doors and tiling.

We are also requesting assistance with school supplies such as: mats, markers, slates, chalk, colored pencils, reams of paper, scissors, and all types of glue.

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

2 new classrooms
School cafeteria

Renovation icone
Renovation and Restoration

Painting and carpentry work
Tile and ceiling installation

Construction icone
Installations scolaires

4 Toilet blocks + Sinks

Construction icone
Equipment, Materials, and Furniture

100 small tables and chairs
Swings and playground equipment
School supply kits

Project category

Equipement

Target learners

200

Cost estimation

17 280 $ US Appr. 9 849 600 XOF

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

We need six additional buildings to develop a complete primary school and provide children with proper access to education. Many children in our community are at risk of growing up without an education, losing opportunities, direction and hope for a better future simply because we lack adequate educational facilities.The nearest primary school from Olpopongi is approximately 9 kilometres away. There is a large river between the village and the school, which becomes difficult and sometimes impossible for children to cross during the rainy season. Our area is also home to wild animals, including elephants, which can pose a serious danger to children travelling long distances on foot.These challenges make accessing education extremely difficult and sometimes unsafe for our children. We believe every child deserves the opportunity to learn, follow their dreams and build a better future, regardless of where they are born

Project details ->
School image description

Context and Problem StatementRwanda has placed inclusive basic education at the heart of its national development strategy. The local NGO ACDS actively works in this area through the management of its school, "La Fraternité". However, faced with local population growth

‍

Project details ->
School image description

PROBLEM / CONTEXT: The JM Manavotra Private High School, located in Alakamisy Ambohimaha, currently has approximately 115 students across several grade levels. Despite the administration's efforts to ensure quality education, the school faces several challenges that limit its capacity and the students' learning conditions. Among the main difficulties encountered: School infrastructure remains insufficient, with some buildings still unfinished.

The number of students is high compared to the school's capacity. Classrooms and school equipment are inadequate. The lack of desks and benches makes studying difficult for some students. The school lacks computer equipment to facilitate learning new technologies. Limited financial resources prevent the school from meeting all its needs. Given this situation, external support is necessary to improve infrastructure, strengthen school equipment, and provide students with a more suitable, safe, and conducive learning environment for their academic success.

Project details ->