Renovation of Kennedy 2 School in Daloa

Côte d'Ivoire
|
Quartier Kennedy 2

Introduction

The schoolKennedy 2 Preschool in Daloais located precisely in the villageQuartier Kennedy 2in the city ofDaloa. Country : Cote d'Ivoire/West Africa.The school needsEquipementof classrooms, equipments and school infrastructure.

General information
Project applicant
Mrs. NADIE ROSE BAGOU
School Director
Contacts
School name

Kennedy 2 Preschool in Daloa

Location (village, region)
Quartier Kennedy 2
Target beneficiairy
200
School conditions

Classrooms are overcrowded (+60) Unrenovated buildings Lack of preschool materials Lack of school supplies

Project category

Equipement

Context

ESTABLISHED in 2000. I have been running this school for three years now. But there are no amenities for these students. Under the previous principal, enrollment was at a maximum of 90 students. When I arrived, after giving the school a few coats of paint, I had 120 students in the first year, then 180, and 187 this year.

‍

Detailed project description

We have 4 buildings, 3 classrooms, and a principal’s office, so we need to build 2 more classrooms. In 2024, we’ll have 180 students. Small tables and chairs: 100; swing set: none; playground equipment: none; restrooms without doors for either students or teachers; we need 2 restrooms for students and teachers.

Buildings to be renovated: 3 classrooms

-Painting, tiling, ceilings

-Electrical work in these rooms, plumbing, carpentry, cafeteria, playroom, and school supplies for underprivileged students.

These are the key needs. The immediate need that is most important to us is doors, tiling, and plastering for the 3 classrooms in time for the start of the school year. At the very least, the doors and tiling.

We are also requesting assistance with school supplies such as: mats, markers, slates, chalk, colored pencils, reams of paper, scissors, and all types of glue.

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

2 new classrooms
School cafeteria

Renovation icone
Renovation and Restoration

Painting and carpentry work
Tile and ceiling installation

Construction icone
Installations scolaires

4 Toilet blocks + Sinks

Construction icone
Equipment, Materials, and Furniture

100 small tables and chairs
Swings and playground equipment
School supply kits

Project category

Equipement

Target learners

200

Cost estimation

17 280 $ US Appr. 9 849 600 XOF

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

Manatido Nations Chapel Mission School was established in 2020 in Manatido, Tatale-Sanguli District, Northern Region, Ghana. The school currently serves 207 children but faces challenges with classroom space, desks and chairs, textbooks, and teaching materials. These challenges affect the learning environment and the quality of education available to the children. We are seeking support to construct additional classrooms, improve existing facilities where necessary, and provide essential educational resources to create a better learning environment for all 207 students.

Project details ->
School image description

The needs are much greater than what I can continue to carry alone. Our current needs include additional classrooms, desks and chairs, textbooks and school supplies, support for children's meals, toilets and sanitation facilities, playground equipment, and transportation for children who live far from the school.

Project details ->
School image description

TESTIMONI SPECIAL SCHOOLS NGBO LTD is experiencing increasing pressure on its existing classroom facilities as the number of students continues to grow. The school currently serves more than 600 students from JSS1 to SS3, with further admissions expected during the current term.
‍
The existing classroom facilities are not sufficient for the growing student population. Some of the available learning spaces are also below the standard learning environment the school seeks to provide, including classrooms with bare or sandy floors and open-sided conditions.

This shortage of suitable classroom space is becoming an important challenge to the school's ability to provide an adequate and comfortable learning environment for all its students. Without additional classrooms, continued growth in enrollment will place further pressure on the existing facilities.

The school therefore seeks support for the construction of additional permanent classrooms to increase capacity and provide students with a more suitable environment for teaching and learning.

Project details ->