Construction
Publié le
|
October 10, 2026

Construction of 7 classrooms - Hekima Primary School in Kyaka II

Uganda
|
Kyaka II Refugee Settlement, Kyegegwa District, Uganda

Problem/ Context

Hekima Primary School Uganda serves approximately 180 enrolled students in Kyaka II Refugee Settlement, Kyegegwa District, Uganda. Students are currently taught in a small church building that Refugee Donation Cup helped build. The school has already acquired land, but does not yet have purpose-built school facilities for its enrolled students.

Detailed project description

Refugee Donation Cup, Inc., a 501(c)(3) nonprofit organization, seeks $30,000 to construct Hekima Primary School Uganda on land already acquired in Kyaka II Refugee Settlement, Kyegegwa District, Uganda.

The construction plan includes 7 classrooms, a cafeteria, kitchen, 4 bathrooms, an office, meeting room, gym, and break area. The school currently serves approximately 180 students, who are taught in a small church building that Refugee Donation Cup helped build. The project will provide dedicated facilities for primary education and related school activities.

Informations générales
Project applicant
Niyomuhuza Mechack
Contacts
Authorized Signatory, Refugee Donation Cup
School name

Hekima Primary School Uganda

Location (village, region)
Kyaka II Refugee Settlement, Kyegegwa District, Uganda
Project category

Construction

Main needs

New school construction

Target learners

180

Coût du projet

$30,000 + Installations

Project status

Received

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

7 classrooms,
A school canteen,
An office, a meeting room,
A gym and a recreation area

‍

Renovation icone
Renovation and Restoration

‍

Construction icone
Installations scolaires

4 toilet blocks
A water fountain or borehole

‍

Construction icone
Equipment, Materials, and Furniture

120 desks and benches
180 school kits and teaching materials

‍

School Photos

Toutes les autres écoles

Retrouvez toutes les candidatures transmises par les villages

Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school

‍

Voir l'école
  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

‍

Voir l'école

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Voir l'école