Construction of Examination Hall and 6 Classrooms for Excel High Academy

Lesotho
|
Ha Tjobe

Problem/ Context

We are a rural school in Lesotho, Excel High Academy. Our school does not have proper buildings that meet the required standards for final examinations. Because of this, our students are forced to travel long distances from our rural area to urban centres to write their final examinations.This long-distance travel causes high transport costs for parents, safety risks for learners, and stress that affects their performance in examinations.

We are therefore seeking support to build a proper examination hall / permanent classrooms at our school premises, so that our learners can write their examinations in a safe, dignified and conducive environment at their own school.

Detailed project description

Project Title: Construction of Examination Hall and Classrooms for Excel High Academy

Objectives:
The main objective of this project is to construct a permanent examination hall and classrooms at our school premises to enable our learners to write their final examinations at school.

Specific objectives are:
1. To build an examination hall that can accommodate 100 learners at a time.
2. To provide safe, permanent, and weather-proof classrooms that meet Ministry of Education standards.
3. To eliminate the need for learners to travel from rural to urban areas for examinations.
4. To improve academic performance and increase school enrolment.

Material Requirements:
To complete this project we will need: cement, building bricks/blocks, river sand, roofing sheets, timber and trusses, windows and doors, flooring materials, electrical installation, paint, and classroom furniture (100 desks and chairs, tables for invigilators). We will also need skilled labour including builders, carpenters and electricians.

Expected Results:
1. Our students will be able to write all final examinations at our own school starting from the next examination season.
2. Reduced financial burden on parents for transport and accommodation during examinations.
3. Improved learner safety, comfort and academic performance.
4. The hall will also serve as a multi-purpose hall for learning, school meetings and community gatherings.
5. The project will ensure long-term sustainable education for vulnerable children in our rural community.

Informations générales
Project applicant
Lehlohonolo Ntsihlele
Founder
Contacts
School name

Excel High Academy

Location (village, region)
Ha Tjobe
Project category

Construction

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

1 Examination room for 100 students
6 Classrooms (compliant with regulations)
Boarding school/Dormitories

Renovation icone
Renovation and Restoration

‍

Construction icone
Installations scolaires

1 Electrical system
6 Restroom blocks

Construction icone
Equipment, Materials, and Furniture

120 desks, benches, and chairs
18 tables for invigilators
Student transport bus

‍

Main needs

New school construction,School expansion : new classrooms

Target learners

120 children

Coût du projet

Estimaion in progree

Project status

Received

School Photos

Les autres projets de construction

Retrouvez tous les projets en cours

School image description
  • Roof with holes in some places, allowing rainwater to seep through
  • Ceilings detached from their supports
  • A dining hall for the cafeteria
  • If possible, a CIE meter for the school
  • Need for tables and benches

‍

Project overview ->
School image description

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Project overview ->
School image description

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Project overview ->