Construction
Publié le
|
27/09/2026

Construction of a New 18-Classroom - Umuezeaka Ngbo

|
Umuezeaka Ngbo, Ohaukwu LGA

Introduction

The schoolTESTIMONI SPECIAL SCHOOLS NGBO LTDis located precisely in the villageUmuezeaka Ngbo, Ohaukwu LGAin the city ofEbonyi State. Country : Nigeria/.The school needsConstructionof classrooms, equipments and school infrastructure.

General information
Project applicant
Elom Daniel Ituma
Director/Proprietor
Contacts
School name

TESTIMONI SPECIAL SCHOOLS NGBO LTD

Location (village, region)
Umuezeaka Ngbo, Ohaukwu LGA
Target beneficiairy
Approximately 974 students projected
School conditions

Classrooms are unfinished Overcrowded classrooms Lack of permanent classrooms Need for teaching materials

Project category

Construction

Context

TESTIMONI SPECIAL SCHOOLS NGBO LTD is experiencing increasing pressure on its existing classroom facilities as the number of students continues to grow. The school currently serves more than 600 students from JSS1 to SS3, with further admissions expected during the current term.
‍
The existing classroom facilities are not sufficient for the growing student population. Some of the available learning spaces are also below the standard learning environment the school seeks to provide, including classrooms with bare or sandy floors and open-sided conditions.

This shortage of suitable classroom space is becoming an important challenge to the school's ability to provide an adequate and comfortable learning environment for all its students. Without additional classrooms, continued growth in enrollment will place further pressure on the existing facilities.

The school therefore seeks support for the construction of additional permanent classrooms to increase capacity and provide students with a more suitable environment for teaching and learning.

Detailed project description

TESTIMONI SPECIAL SCHOOLS NGBO LTD was founded in 2013 and is legally registered in Nigeria under CAC RC No. 8937305. The school currently serves more than 600 students and operates a scholarship programme supporting more than 200 students at present, with more than 500 students having benefited from scholarship support over the years.

TESTIMONI SPECIAL SCHOOLS NGBO LTD was founded in 2013 and is legally registered in Nigeria under CAC RC No. 8937305. The school currently serves more than 600 students and operates a scholarship programme supporting more than 200 students at present, with more than 500 students having benefited from scholarship support over the years. The proposed project is the construction of a new two-storey school building with three levels in total, comprising 18 classrooms: six classrooms on the ground floor, six classrooms on the first floor and six classrooms on the second floor.

The main objective is to increase classroom capacity and provide a safer, more suitable and more durable learning environment for the growing number of students at TESTIMONI SPECIAL SCHOOLS NGBO LTD. The project will require the construction materials and building works necessary to complete the proposed classroom block, including structural works, masonry, roofing, flooring, doors, windows, electrical works, plumbing, finishing and other works required to make the classrooms functional. The final technical specifications and quantities will be established through professional design, site assessment and a detailed Bill of Quantities. The expected result is the creation of 18 additional classrooms, substantially increasing the school's available learning space and reducing pressure on the existing facilities.

The project will enable more students to learn in appropriate classrooms and provide a stronger physical foundation for the school's continued educational work. Beyond addressing the immediate shortage of classroom space, the improved facilities will support the school's longer-term educational vision, including greater opportunities for technology, digital learning, practical skills, creativity and entrepreneurship.

The project is intended to benefit the school's growing student population and strengthen access to a more appropriate learning environment for children and young people in the surrounding community.

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

18 new classrooms
Structural work
Masonry

Renovation icone
Renovation and Restoration

Finishing Work on the First Building
Roofing
Flooring
Door Installation

Construction icone
Installations scolaires

Electrical System
6 restroom units

Construction icone
Equipment, Materials, and Furniture

360 Tables and Benches

‍

Project category

Construction

Target learners

Approximately 974 students projected

Cost estimation

Estimate of the work to be done

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

The Konankro State Primary School (EPP), situated in the Bodokro sub-prefecture in the Gbêkê region of Côte d’Ivoire, has around 120 pupils. Despite its vital role in the education of local children, the school requires additional facilities to improve learning conditions and meet the needs of its pupil population. The lack of sufficient classrooms limits the school’s ability to accommodate pupils in suitable conditions.

Furthermore, the shortage of suitable accommodation for teachers makes it more difficult for them to settle in the area and may jeopardise their long-term commitment to the school. In light of this situation, the construction of three additional classrooms and two staff flats is a pressing priority. The completion of these facilities would help to improve the school environment, facilitate the work of teachers and provide pupils with better conditions in which to learn and succeed.

Project details ->
School image description

The school have temporary buildings which built by wooden structures and the class rooms aren’t enough. Inadequate classroom equipments like furniture desks, toilet, sanitation equipments (water)

‍

Project details ->
School image description

MU RUGO RUGALI GARILEA serves 143 children in a community where the school seeks to contribute to access to early childhood and primary education. Although the school has classrooms and a team of teachers and support staff, its infrastructure remains limited.Five of the seven existing classrooms are old and all seven are not enough to receive all the available customers where 77 pending children in this first term 2026 have not yet been registered.

The school also lacks a dedicated library, a suitable kitchen building and a dining hall. In addition, the school seeks a perimeter fence to define the school boundary and improve the management and security of the compound.

The school intends to extend its educational provision to Primary Five and Primary Six next academic year 2027-2028, subject to the required authorization but right now an urgent need is on expanding baby class and Primary one where we have ready children but no classes to put them in. Additional classroom space is therefore a priority. A library would give children greater access to storybooks and reference materials. A dedicated kitchen and dining hall would help organise meal preparation and pupils' meals more appropriately.

The school needs additional classrooms to support its planned expansion to find where to put received client in this first term that started on 07/09/2026 where we had 220 children but we managed to accommodate 143 only, others are still not registered and are willing to come any time we get two at least two classes to put them in. It also needs a library to encourage reading, a kitchen for food preparation, a dining hall for pupils' meals, and a perimeter fence to help define and secure the school compound.

Project details ->