The classrooms are unfinished and not enough.The grounds is unfinished We lack qualified teachers We require solar powered electricity
The schoolTESTIMONI SPECIAL SCHOOLS NGBO LTDis located precisely in the villageUmuezeaka Ngbo, Ohaukwu LGAin the city ofEbonyi State. Country : Nigeria/.The school needsConstructionof classrooms, equipments and school infrastructure.
TESTIMONI SPECIAL SCHOOLS NGBO LTD
Classrooms are unfinished Overcrowded classrooms Lack of permanent classrooms Need for teaching materials
Construction
TESTIMONI SPECIAL SCHOOLS NGBO LTD is experiencing increasing pressure on its existing classroom facilities as the number of students continues to grow. The school currently serves more than 600 students from JSS1 to SS3, with further admissions expected during the current term.
The existing classroom facilities are not sufficient for the growing student population. Some of the available learning spaces are also below the standard learning environment the school seeks to provide, including classrooms with bare or sandy floors and open-sided conditions.
This shortage of suitable classroom space is becoming an important challenge to the school's ability to provide an adequate and comfortable learning environment for all its students. Without additional classrooms, continued growth in enrollment will place further pressure on the existing facilities.
The school therefore seeks support for the construction of additional permanent classrooms to increase capacity and provide students with a more suitable environment for teaching and learning.

TESTIMONI SPECIAL SCHOOLS NGBO LTD was founded in 2013 and is legally registered in Nigeria under CAC RC No. 8937305. The school currently serves more than 600 students and operates a scholarship programme supporting more than 200 students at present, with more than 500 students having benefited from scholarship support over the years.
TESTIMONI SPECIAL SCHOOLS NGBO LTD was founded in 2013 and is legally registered in Nigeria under CAC RC No. 8937305. The school currently serves more than 600 students and operates a scholarship programme supporting more than 200 students at present, with more than 500 students having benefited from scholarship support over the years. The proposed project is the construction of a new two-storey school building with three levels in total, comprising 18 classrooms: six classrooms on the ground floor, six classrooms on the first floor and six classrooms on the second floor.
The main objective is to increase classroom capacity and provide a safer, more suitable and more durable learning environment for the growing number of students at TESTIMONI SPECIAL SCHOOLS NGBO LTD. The project will require the construction materials and building works necessary to complete the proposed classroom block, including structural works, masonry, roofing, flooring, doors, windows, electrical works, plumbing, finishing and other works required to make the classrooms functional. The final technical specifications and quantities will be established through professional design, site assessment and a detailed Bill of Quantities. The expected result is the creation of 18 additional classrooms, substantially increasing the school's available learning space and reducing pressure on the existing facilities.
The project will enable more students to learn in appropriate classrooms and provide a stronger physical foundation for the school's continued educational work. Beyond addressing the immediate shortage of classroom space, the improved facilities will support the school's longer-term educational vision, including greater opportunities for technology, digital learning, practical skills, creativity and entrepreneurship.
The project is intended to benefit the school's growing student population and strengthen access to a more appropriate learning environment for children and young people in the surrounding community.

18 new classrooms
Structural work
Masonry
Finishing Work on the First Building
Roofing
Flooring
Door Installation
Electrical System
6 restroom units
360 Tables and Benches
Construction
Approximately 974 students projected
Estimate of the work to be done
Received
See all current projects

The classrooms are unfinished and not enough.The grounds is unfinished We lack qualified teachers We require solar powered electricity

Muthara Progressive Academy in rural Kirinyaga County serves approximately 360 vulnerable children from low-income households. The school currently relies on temporary wooden classrooms that provide inadequate protection against heavy rainfall, dampness and cold weather. During rainy and cold seasons, these conditions make classrooms uncomfortable, disrupt learning and raise concerns about children's health and wellbeing. Due to limited financial resources, the school cannot replace all the wooden structures at once. It therefore seeks support to construct two permanent classrooms as the first phase of a gradual programme to provide safe, durable and child-friendly learning environments.

NEW HOPE Nursery and Primary School, located in Mbata Village, Mbata Parish, Bwesumbu Sub-County, Kasese District, Uganda, is facing a serious challenge of inadequate permanent classroom infrastructure. The school currently serves 316 pupils and employs 13 teachers, but it lacks permanent classroom buildings to provide a safe, stable, and conducive learning environment for its learners.The absence of permanent classrooms exposes pupils to difficulties during adverse weather conditions and affects the effective delivery of lessons. It also limits the school's ability to improve the quality of education, provide adequate learning space, and support the educational needs of children from rural and economically disadvantaged families.
The school owns land on which permanent classrooms can be constructed; however, limited financial resources have made it difficult for the school administration and parents to undertake the construction independently.
This situation threatens the school's efforts to provide quality and inclusive education to children in the community. We therefore urgently seek support for the construction of five permanent classrooms at an estimated cost of UGX 56,000,000. The project will improve learning conditions, strengthen teaching effectiveness, and provide a better educational foundation for the 316 pupils currently enrolled at NEW HOPE Nursery and Primary School.