Construction
Publié le
|
September 27, 2026

Construction of a New 18-Classroom - Umuezeaka Ngbo

|
Umuezeaka Ngbo, Ohaukwu LGA

Problem/ Context

TESTIMONI SPECIAL SCHOOLS NGBO LTD is experiencing increasing pressure on its existing classroom facilities as the number of students continues to grow. The school currently serves more than 600 students from JSS1 to SS3, with further admissions expected during the current term.
‍
The existing classroom facilities are not sufficient for the growing student population. Some of the available learning spaces are also below the standard learning environment the school seeks to provide, including classrooms with bare or sandy floors and open-sided conditions.

This shortage of suitable classroom space is becoming an important challenge to the school's ability to provide an adequate and comfortable learning environment for all its students. Without additional classrooms, continued growth in enrollment will place further pressure on the existing facilities.

The school therefore seeks support for the construction of additional permanent classrooms to increase capacity and provide students with a more suitable environment for teaching and learning.

Detailed project description

TESTIMONI SPECIAL SCHOOLS NGBO LTD was founded in 2013 and is legally registered in Nigeria under CAC RC No. 8937305. The school currently serves more than 600 students and operates a scholarship programme supporting more than 200 students at present, with more than 500 students having benefited from scholarship support over the years.

TESTIMONI SPECIAL SCHOOLS NGBO LTD was founded in 2013 and is legally registered in Nigeria under CAC RC No. 8937305. The school currently serves more than 600 students and operates a scholarship programme supporting more than 200 students at present, with more than 500 students having benefited from scholarship support over the years. The proposed project is the construction of a new two-storey school building with three levels in total, comprising 18 classrooms: six classrooms on the ground floor, six classrooms on the first floor and six classrooms on the second floor.

The main objective is to increase classroom capacity and provide a safer, more suitable and more durable learning environment for the growing number of students at TESTIMONI SPECIAL SCHOOLS NGBO LTD. The project will require the construction materials and building works necessary to complete the proposed classroom block, including structural works, masonry, roofing, flooring, doors, windows, electrical works, plumbing, finishing and other works required to make the classrooms functional. The final technical specifications and quantities will be established through professional design, site assessment and a detailed Bill of Quantities. The expected result is the creation of 18 additional classrooms, substantially increasing the school's available learning space and reducing pressure on the existing facilities.

The project will enable more students to learn in appropriate classrooms and provide a stronger physical foundation for the school's continued educational work. Beyond addressing the immediate shortage of classroom space, the improved facilities will support the school's longer-term educational vision, including greater opportunities for technology, digital learning, practical skills, creativity and entrepreneurship.

The project is intended to benefit the school's growing student population and strengthen access to a more appropriate learning environment for children and young people in the surrounding community.

Project applicant
Elom Daniel Ituma
Director/Proprietor
+2348036 32 80 90
School name

TESTIMONI SPECIAL SCHOOLS NGBO LTD

Location (village, region)
Umuezeaka Ngbo, Ohaukwu LGA
Project category

Construction

Main needs

School expansion : New classrooms

Target learners

Approximately 974 students projected

Coût du projet

Estimate of the work to be done

Project status

Received

List of needs
Construction icone
Buildings to Be Constructed

18 new classrooms
Structural work
Masonry

Renovation icone
Renovation and Restoration

Finishing Work on the First Building
Roofing
Flooring
Door Installation

Construction icone
Installations scolaires

Electrical System
6 restroom units

Construction icone
Equipment, Materials, and Furniture

360 Tables and Benches

‍

School Photos

Toutes les autres écoles

Retrouvez toutes les candidatures transmises par les villages

The school’s two buildings are unfinished and dilapidated; they have 4 and 2 classrooms, respectively, for a total enrollment of 357 students. There are more than 65 students per class. The desks and benches are broken and insufficient. Three or more students sit on each bench instead of two.

‍

Voir l'école

ESTABLISHED in 2000. I have been running this school for three years now. But there are no amenities for these students. Under the previous principal, enrollment was at a maximum of 90 students. When I arrived, after giving the school a few coats of paint, I had 120 students in the first year, then 180, and 187 this year.

‍

Voir l'école

The school originally planned (32 classrooms) was not fully completed due to a lack of funding. The current capacity (6 classrooms) is insufficient to meet the needs of the village and the surrounding areas.