Construction
Publié le
|
27/09/2026

Construction of a New 18-Classroom - Umuezeaka Ngbo

|
Umuezeaka Ngbo, Ohaukwu LGA

Introduction

The schoolTESTIMONI SPECIAL SCHOOLS NGBO LTDis located precisely in the villageUmuezeaka Ngbo, Ohaukwu LGAin the city ofEbonyi State. Country : Nigeria/.The school needsConstructionof classrooms, equipments and school infrastructure.

General information
Project applicant
Elom Daniel Ituma
Director/Proprietor
Contacts
School name

TESTIMONI SPECIAL SCHOOLS NGBO LTD

Location (village, region)
Umuezeaka Ngbo, Ohaukwu LGA
Target beneficiairy
Approximately 974 students projected
School conditions

Classrooms are unfinished Overcrowded classrooms Lack of permanent classrooms Need for teaching materials

Project category

Construction

Context

TESTIMONI SPECIAL SCHOOLS NGBO LTD is experiencing increasing pressure on its existing classroom facilities as the number of students continues to grow. The school currently serves more than 600 students from JSS1 to SS3, with further admissions expected during the current term.
‍
The existing classroom facilities are not sufficient for the growing student population. Some of the available learning spaces are also below the standard learning environment the school seeks to provide, including classrooms with bare or sandy floors and open-sided conditions.

This shortage of suitable classroom space is becoming an important challenge to the school's ability to provide an adequate and comfortable learning environment for all its students. Without additional classrooms, continued growth in enrollment will place further pressure on the existing facilities.

The school therefore seeks support for the construction of additional permanent classrooms to increase capacity and provide students with a more suitable environment for teaching and learning.

Detailed project description

TESTIMONI SPECIAL SCHOOLS NGBO LTD was founded in 2013 and is legally registered in Nigeria under CAC RC No. 8937305. The school currently serves more than 600 students and operates a scholarship programme supporting more than 200 students at present, with more than 500 students having benefited from scholarship support over the years.

TESTIMONI SPECIAL SCHOOLS NGBO LTD was founded in 2013 and is legally registered in Nigeria under CAC RC No. 8937305. The school currently serves more than 600 students and operates a scholarship programme supporting more than 200 students at present, with more than 500 students having benefited from scholarship support over the years. The proposed project is the construction of a new two-storey school building with three levels in total, comprising 18 classrooms: six classrooms on the ground floor, six classrooms on the first floor and six classrooms on the second floor.

The main objective is to increase classroom capacity and provide a safer, more suitable and more durable learning environment for the growing number of students at TESTIMONI SPECIAL SCHOOLS NGBO LTD. The project will require the construction materials and building works necessary to complete the proposed classroom block, including structural works, masonry, roofing, flooring, doors, windows, electrical works, plumbing, finishing and other works required to make the classrooms functional. The final technical specifications and quantities will be established through professional design, site assessment and a detailed Bill of Quantities. The expected result is the creation of 18 additional classrooms, substantially increasing the school's available learning space and reducing pressure on the existing facilities.

The project will enable more students to learn in appropriate classrooms and provide a stronger physical foundation for the school's continued educational work. Beyond addressing the immediate shortage of classroom space, the improved facilities will support the school's longer-term educational vision, including greater opportunities for technology, digital learning, practical skills, creativity and entrepreneurship.

The project is intended to benefit the school's growing student population and strengthen access to a more appropriate learning environment for children and young people in the surrounding community.

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

18 new classrooms
Structural work
Masonry

Renovation icone
Renovation and Restoration

Finishing Work on the First Building
Roofing
Flooring
Door Installation

Construction icone
Installations scolaires

Electrical System
6 restroom units

Construction icone
Equipment, Materials, and Furniture

360 Tables and Benches

‍

Project category

Construction

Target learners

Approximately 974 students projected

Cost estimation

Estimate of the work to be done

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

Manatido Nations Chapel Mission School was established in 2020 in Manatido, Tatale-Sanguli District, Northern Region, Ghana. The school currently serves 207 children but faces challenges with classroom space, desks and chairs, textbooks, and teaching materials. These challenges affect the learning environment and the quality of education available to the children. We are seeking support to construct additional classrooms, improve existing facilities where necessary, and provide essential educational resources to create a better learning environment for all 207 students.

Project details ->
School image description

The needs are much greater than what I can continue to carry alone. Our current needs include additional classrooms, desks and chairs, textbooks and school supplies, support for children's meals, toilets and sanitation facilities, playground equipment, and transportation for children who live far from the school.

Project details ->
School image description

King’s Glory currently serves 883 learners in Kamuli District, including vulnerable children from families that struggle to meet education needs. The existing learning space is not sufficient for the number of learners being served. Additional classrooms are needed to reduce pressure on the existing facilities and provide a safer and more suitable environment for teaching and learning.

‍

Project details ->