Construction
Publié le
|
02/11/2026

Construction of 6 Classrooms - Shule ya Msingi Engordoto

Tanzania
|
olpopongi

Problem/ Context

We need six additional buildings to develop a complete primary school and provide children with proper access to education. Many children in our community are at risk of growing up without an education, losing opportunities, direction and hope for a better future simply because we lack adequate educational facilities.The nearest primary school from Olpopongi is approximately 9 kilometres away. There is a large river between the village and the school, which becomes difficult and sometimes impossible for children to cross during the rainy season. Our area is also home to wild animals, including elephants, which can pose a serious danger to children travelling long distances on foot.These challenges make accessing education extremely difficult and sometimes unsafe for our children. We believe every child deserves the opportunity to learn, follow their dreams and build a better future, regardless of where they are born

Detailed project description

The main objective of this project is to improve access to quality primary education for children in Olpopongi, Engordoto and the surrounding communities by developing a complete and safe primary school.

Our specific objectives are:

1.  To construct six additional school buildings to expand the existing educational facilities.
2. To provide children with access to primary education closer to their homes.
3.  To reduce the risks children face when travelling long distances, crossing rivers during the rainy season and encountering dangerous wildlife, including elephants.
4.  To create a safe, supportive and child-friendly learning environment.
5.   To provide adequate classrooms and essential educational facilities for children.
6.  To reduce the number of children growing up without access to proper education.
7.  To create better opportunities for future generations through education.

 Material Requirements

To complete this project, we require support with construction materials, educational equipment and essential school facilities.

Construction materials:
Cement, sand, stones and gravel.
Bricks and building blocks.
Roofing sheets and timber.
Steel, reinforcement bars and other structural materials.
Doors, windows and glass.
Paint and finishing materials.
Electrical and plumbing materials.

Classroom and educational equipment
Desks and chairs for pupils.
Teachers' tables and chairs.
Blackboards or whiteboards.
Bookshelves and storage cabinets.
Textbooks, exercise books and stationery.
Teaching and learning materials.

Essential school facilities:
Toilets and sanitation facilities.
Clean water supply.
Handwashing facilities.
Proper classroom lighting and ventilation.
A safe outdoor learning and playing environment.

 Expected Results and Impact
The successful completion of this project will bring significant and lasting benefits to children and families in our community.
Six additional school buildings will help establish the infrastructure needed for a complete primary school.
More children from Olpopongi, Engordoto and neighbouring communities will have access to education.
Children will no longer need to depend entirely on distant schools that require dangerous journeys.
School attendance and learning opportunities will improve, particularly during the rainy season.
Children will have a safer environment in which to learn, develop their talents and pursue their dreams.
Families will have greater confidence that their children can receive an education close to home.
The community will have a stronger foundation for social and economic development.

We believe education is the foundation of a better future. By bringing a complete primary school closer to our children, we are not only building classrooms; we are creating opportunities, protecting young lives and investing in future teachers, doctors, engineers and responsible leaders.

Our dream is that no child in Olpopongi or the surrounding communities should be left behind simply because access to education is difficult.

Informations générales
Project applicant
Mathayo Cosmas Namuyata
Angaza maisha foundation Co founder and a citizen of olpopongi village
Contacts
School name

Shule ya Msingi Engordoto

Location (village, region)
olpopongi
Project category

Construction

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

6 additional classrooms
1 administrative office
1 multipurpose room
1 outdoor playground

‍

Renovation icone
Renovation and Restoration

Painting
Roof finishing

Construction icone
Installations scolaires

3 Sanitary blocks
1 Electrical system
1 Water pump/borehole
1 Water fountain

Construction icone
Equipment, Materials, and Furniture

180 Tables and benches: 2 seats
30 Office furniture packages
3 Blackboards or whiteboards

‍

School conditions

1 classroom only: 4+ students per bench Overcrowded classroom: 70 students No school fence No toilets/toilets No electricity or running water Lack of teaching materials The nearest primary school is 9 km away

Target learners

More than 70 children per year we could help 400 if we have enouph classrooms

Coût du projet

To be done

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

The Konankro State Primary School (EPP), situated in the Bodokro sub-prefecture in the Gbêkê region of Côte d’Ivoire, has around 120 pupils. Despite its vital role in the education of local children, the school requires additional facilities to improve learning conditions and meet the needs of its pupil population. The lack of sufficient classrooms limits the school’s ability to accommodate pupils in suitable conditions.

Furthermore, the shortage of suitable accommodation for teachers makes it more difficult for them to settle in the area and may jeopardise their long-term commitment to the school. In light of this situation, the construction of three additional classrooms and two staff flats is a pressing priority. The completion of these facilities would help to improve the school environment, facilitate the work of teachers and provide pupils with better conditions in which to learn and succeed.

Project details ->
School image description

The school have temporary buildings which built by wooden structures and the class rooms aren’t enough. Inadequate classroom equipments like furniture desks, toilet, sanitation equipments (water)

‍

Project details ->
School image description

MU RUGO RUGALI GARILEA serves 143 children in a community where the school seeks to contribute to access to early childhood and primary education. Although the school has classrooms and a team of teachers and support staff, its infrastructure remains limited.Five of the seven existing classrooms are old and all seven are not enough to receive all the available customers where 77 pending children in this first term 2026 have not yet been registered.

The school also lacks a dedicated library, a suitable kitchen building and a dining hall. In addition, the school seeks a perimeter fence to define the school boundary and improve the management and security of the compound.

The school intends to extend its educational provision to Primary Five and Primary Six next academic year 2027-2028, subject to the required authorization but right now an urgent need is on expanding baby class and Primary one where we have ready children but no classes to put them in. Additional classroom space is therefore a priority. A library would give children greater access to storybooks and reference materials. A dedicated kitchen and dining hall would help organise meal preparation and pupils' meals more appropriately.

The school needs additional classrooms to support its planned expansion to find where to put received client in this first term that started on 07/09/2026 where we had 220 children but we managed to accommodate 143 only, others are still not registered and are willing to come any time we get two at least two classes to put them in. It also needs a library to encourage reading, a kitchen for food preparation, a dining hall for pupils' meals, and a perimeter fence to help define and secure the school compound.

Project details ->