Construction
Publié le
|
03/11/2026

Construction of 2 Classrooms at Muthara Progressive Academy

Kenya
|
Inoi

Problem/ Context

Muthara Progressive Academy in rural Kirinyaga County serves approximately 360 vulnerable children from low-income households. The school currently relies on temporary wooden classrooms that provide inadequate protection against heavy rainfall, dampness and cold weather. During rainy and cold seasons, these conditions make classrooms uncomfortable, disrupt learning and raise concerns about children's health and wellbeing. Due to limited financial resources, the school cannot replace all the wooden structures at once. It therefore seeks support to construct two permanent classrooms as the first phase of a gradual programme to provide safe, durable and child-friendly learning environments.

‍

Detailed project description

Muthara Progressive Academy, located in rural Kirinyaga County, Kenya, seeks financial support of €16,000 to construct two permanent classrooms to improve learning conditions for 360 vulnerable children from low-income households.

Currently, the school relies on temporary wooden classrooms that provide inadequate protection against heavy rainfall, dampness and cold weather. During rainy and cold seasons, the classrooms become uncomfortable for learners, disrupting lessons and raising concerns about children's health, safety and wellbeing. The school has limited financial resources and cannot replace all its temporary structures at once. It therefore proposes a phased infrastructure improvement programme, beginning with the construction of two permanent classrooms.

Project objectives

Construct two durable, permanent classrooms to replace two existing temporary wooden classrooms.

Provide safe, comfortable and weather-resistant learning spaces that protect children against rain, dampness and cold conditions.

Improve the learning environment, concentration, attendance and general wellbeing of vulnerable learners.

Strengthen the school's educational infrastructure and establish a foundation for gradually replacing the remaining wooden classrooms.

Materials and construction activities

The project will use locally available, durable construction materials, including:

Building stones or suitable masonry blocks for permanent walls.

Cement, sand, ballast and hardcore for foundations and concrete works.

Reinforcement steel where required by the structural design.

Roofing timber or steel supports and durable iron sheets.

Cement and other materials for strong, smooth classroom floors.

Doors, window frames, glass panes and secure fittings.

Plastering materials, paint and other finishing materials.

Plumbing or electrical fittings where required by the approved classroom design.

Construction activities will include site preparation, foundation excavation, construction of walls, roofing, installation of doors and windows, flooring, plastering, painting and final inspection.

Expected results

By the end of the three-month implementation period, the project expects to achieve the following:

Two fully completed permanent classrooms.

Replacement of two vulnerable temporary wooden classroom structures.

Improved learning conditions for approximately 360 children.

Better protection against rainfall, dampness and cold weather.

A safer, more comfortable and conducive environment for teaching and learning.

Improved school infrastructure that can serve present and future generations of learners.

Sustainability

The school management will take responsibility for maintaining the completed classrooms through regular inspections, cleaning and timely repairs. Parents and community members will be encouraged to support the maintenance of the facilities. The two classrooms will form the first phase of a long-term plan to gradually replace all temporary wooden classrooms as additional funding becomes available.

The total project budget is €16,000, covering construction materials, skilled and casual labour, transportation and related construction costs. Muthara Progressive Academy respectfully seeks Action For Africa's support to make this important improvement possible and provide vulnerable rural children with safer and better learning facilities.

‍

Informations générales
Project applicant
Mercy Nyakeyo Murithi
school administror
Contacts
School name

Muthara progressive Academy

Location (village, region)
Inoi
School conditions

The classrooms are made of wood There is no school building Rainwater leaks into the classrooms There is a lack of school infrastructure

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

6 classrooms
1 administration building
1 multipurpose room

Construction icone
Installations scolaires

6 toilet blocks
1 water fountain

Construction icone
Equipment, Materials, and Furniture

130 desks and benches
30 sets of teaching materials
Office furniture and chairs
3 computers and 2 printers

Project category

Construction

Target learners

360

Coût du projet

€16,000 (

Project status

Received

Other construction projects

See all current projects

School image description

The pupils in the CI class are housed in a temporary shelter made of straw. There are 55 pupils in total, and they struggle to work properly given the circumstances. During break time, all the pupils go to the village square, which is about 400 metres from the school, to get their breakfast and often return late, hence the need for a school canteen.

Project details ->
School image description

Mapalo Community School is a government-run public school in Zambia serving an estimated 700–1000 learners. The school faces infrastructure challenges that require attention to ensure that learners have a safe, adequate and supportive environment in which to learn.

The proposed project will address the school's priority needs, which include deteriorated classroom buildings, insufficient classroom space, inadequate desks and benches, limited teaching and learning materials, and deficiencies in water and sanitation facilities.

‍

Project details ->
School image description

To improve the quality of teaching and learning, so that every pupil has the opportunity to read, write, do arithmetic, speak well, think critically and solve problems in line with the level they have reached.

Project details ->