Construction
Publié le
|
02/11/2026

Building Reconstruction and Equipment - La Fraternité School

Madagascar
|
ayabakora

Problem/ Context

Context and Problem StatementRwanda has placed inclusive basic education at the heart of its national development strategy. The local NGO ACDS actively works in this area through the management of its school, "La Fraternité". However, faced with local population growth

‍

Detailed project description

NGO Name: ACDS (Christian Action for Social Development)
RGB Registration No: 508/RGB/NGO/LP/05/2019
Kigali, Rwanda

CONCEPTUAL NOTE FOR THE SCHOOL RECONSTRUCTION PROJECT
Project: Modern reconstruction with additional floors and equipment for the "La Fraternité" nursery and primary school
Location: Republic of Rwanda
Direct beneficiaries: +600 students (nursery, preschool, and primary levels)
Total construction budget: 650,000,000 RWF (393,345.74 EUR)
Current technical status: Secured land (owned by the SCHOOL), Building permit obtained, Architectural engineering plans and Cost Estimate approved (Ready-to-Build Project).

1. Context and Problem Statement
Rwanda has placed inclusive basic education at the heart of its national strategy development. The local NGO ACDS actively works in this area through the management of its school, "La Fraternité." However, faced with strong local population growth and pressure on existing infrastructure, the current premises have become obsolete, cramped, and overcrowded. Overcrowded classrooms threaten the children's health and safety and drastically limit educational potential. To meet the influx of requests from vulnerable families, the school urgently needs a major structural transformation.

2. Project Objectives
The main objective is to demolish the dilapidated ground-level structures and build a modern, multi-story school complex (ground floor + 1/2 floors), optimizing the NGO's available land.

• Increased capacity: To transfer and educate more than 600 students in conditions of dignity and optimal safety.

• Sustainable infrastructure: To provide spacious, well-ventilated, and equipped classrooms, administrative offices for staff, and a building Modern sanitary facilities strictly compliant with eco-responsible sanitation standards (Eco-WASH).

3. Description of Activities and Budget
The project is ready for immediate implementation thanks to the prior approval of all regulatory documents by the district. The total budget of RWF 650,000,000 (EUR 393,345.74) is divided into four main funding components:
1. Structural Work and Elevation (60%): Special foundations for multi-story structures, heavy masonry, reinforced concrete slabs, and eco-resilient metal roofing.

2. Interior Work and Finishing (15%): Plumbing, electrical work, carpentry (doors/windows), plastering, and flooring.

3. Eco-WASH Sanitation Facility (10%): Construction of separate latrines for girls and boys and installation of a rainwater harvesting system.

4. Furnishings and Equipment (10%): Complete provision of school furnishings in desks and benches, administrative offices, and teaching materials.

(A 5% contingency is maintained for technical inspections and unforeseen material costs).

4. Social Impact and Sustainability (Self-Financing)
• Impact: Immediate access to quality basic education for 600 children, reduced school dropout rates, and early integration through modern preschool programs.

• Financial Sustainability: The NGO ACDS guarantees long-term viability without continuous dependence on donors for operations. Teacher salaries will be covered by an integration agreement with the Ministry of Education (MINEDUC/REB). Operating costs, utilities, and building maintenance will be covered independently through a proven self-financing model: a family-friendly, solidarity-based schooling system, rental income from the facility during holidays, and a structural balancing grant from the NGO ACDS.

MUKIZA Emmanuel
Executive Director of the organization (ACDS)

Informations générales
Project applicant
Christian Action for Social Development (ACDS)
Executive Director of the organization
Contacts
School name

La Fraternité

Location (village, region)
ayabakora
Project category

Construction

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

Building: 1st and 2nd floors

‍

Construction icone
Installations scolaires

6 restroom blocks

Construction icone
Equipment, Materials, and Furniture

150 desks and benches
30 sets of teaching materials
40 school kits

School conditions

The current facilities are outdated Classrooms are overcrowded Restroom block in poor condition Lack of desks, benches, and supplies

Target learners

600 Elèves

Coût du projet

650,000,000 RWF (393,345.74 EUR)

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

Our pupil numbers have increased, and we have been forced to triple the size of the SIL and CP classes, double the size of the CM1 class, and use the parish hall – which is outside the school grounds – for the CM2 class. We therefore wish to plan ahead for the start of the next school year.

Project details ->
School image description

In rural areas around Hargeisa, many children from low-income families face significant barriers to accessing quality education due to the lack of schools, long distances to existing educational facilities, and limited financial resources. As a result, many children are unable to attend school or continue their education. Girls and vulnerable children are particularly affected by these challenges. This project aims to address these problems by building a school that provides accessible, safe, and affordable quality education for children from disadvantaged families. The school will help improve literacy, create equal educational opportunities, and contribute to the long-term development of the local community.

Project details ->
School image description

Kins Favour Academy, located in Dagoretti North Sub-County, Nairobi County, Kenya, was established in August 2009 with just one learner and has grown to approximately 405 learners, from Kindergarten to Junior Nine.However, the school’s growth has created a significant need for adequate and permanent learning facilities. Many learners currently study in temporary classrooms, which do not provide the long-term, stable learning environment required by a growing school. Limited financial resources have made it difficult to complete the remaining construction works. Without additional support, the school will continue facing challenges in providing adequate, durable learning spaces for its growing number of learners.

Project details ->