Building Reconstruction and Equipment - La Fraternité School

Madagascar
|
ayabakora

Problem/ Context

Context and Problem StatementRwanda has placed inclusive basic education at the heart of its national development strategy. The local NGO ACDS actively works in this area through the management of its school, "La Fraternité". However, faced with local population growth

‍

Detailed project description

NGO Name: ACDS (Christian Action for Social Development)
RGB Registration No: 508/RGB/NGO/LP/05/2019
Kigali, Rwanda

CONCEPTUAL NOTE FOR THE SCHOOL RECONSTRUCTION PROJECT
Project: Modern reconstruction with additional floors and equipment for the "La Fraternité" nursery and primary school
Location: Republic of Rwanda
Direct beneficiaries: +600 students (nursery, preschool, and primary levels)
Total construction budget: 650,000,000 RWF (393,345.74 EUR)
Current technical status: Secured land (owned by the SCHOOL), Building permit obtained, Architectural engineering plans and Cost Estimate approved (Ready-to-Build Project).

1. Context and Problem Statement
Rwanda has placed inclusive basic education at the heart of its national strategy development. The local NGO ACDS actively works in this area through the management of its school, "La Fraternité." However, faced with strong local population growth and pressure on existing infrastructure, the current premises have become obsolete, cramped, and overcrowded. Overcrowded classrooms threaten the children's health and safety and drastically limit educational potential. To meet the influx of requests from vulnerable families, the school urgently needs a major structural transformation.

2. Project Objectives
The main objective is to demolish the dilapidated ground-level structures and build a modern, multi-story school complex (ground floor + 1/2 floors), optimizing the NGO's available land.

• Increased capacity: To transfer and educate more than 600 students in conditions of dignity and optimal safety.

• Sustainable infrastructure: To provide spacious, well-ventilated, and equipped classrooms, administrative offices for staff, and a building Modern sanitary facilities strictly compliant with eco-responsible sanitation standards (Eco-WASH).

3. Description of Activities and Budget
The project is ready for immediate implementation thanks to the prior approval of all regulatory documents by the district. The total budget of RWF 650,000,000 (EUR 393,345.74) is divided into four main funding components:
1. Structural Work and Elevation (60%): Special foundations for multi-story structures, heavy masonry, reinforced concrete slabs, and eco-resilient metal roofing.

2. Interior Work and Finishing (15%): Plumbing, electrical work, carpentry (doors/windows), plastering, and flooring.

3. Eco-WASH Sanitation Facility (10%): Construction of separate latrines for girls and boys and installation of a rainwater harvesting system.

4. Furnishings and Equipment (10%): Complete provision of school furnishings in desks and benches, administrative offices, and teaching materials.

(A 5% contingency is maintained for technical inspections and unforeseen material costs).

4. Social Impact and Sustainability (Self-Financing)
• Impact: Immediate access to quality basic education for 600 children, reduced school dropout rates, and early integration through modern preschool programs.

• Financial Sustainability: The NGO ACDS guarantees long-term viability without continuous dependence on donors for operations. Teacher salaries will be covered by an integration agreement with the Ministry of Education (MINEDUC/REB). Operating costs, utilities, and building maintenance will be covered independently through a proven self-financing model: a family-friendly, solidarity-based schooling system, rental income from the facility during holidays, and a structural balancing grant from the NGO ACDS.

MUKIZA Emmanuel
Executive Director of the organization (ACDS)

Informations générales
Project applicant
Christian Action for Social Development (ACDS)
Executive Director of the organization
Contacts
School name

La Fraternité

Location (village, region)
ayabakora
Project category

Construction

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

Building: 1st and 2nd floors

‍

Construction icone
Installations scolaires

6 restroom blocks

Construction icone
Equipment, Materials, and Furniture

150 desks and benches
30 sets of teaching materials
40 school kits

Main needs

The current facilities are outdated Classrooms are overcrowded Restroom block in poor condition Lack of desks, benches, and supplies

Target learners

600 Elèves

Coût du projet

650,000,000 RWF (393,345.74 EUR)

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

The Bright Future School project aims to improve access to quality education for children in Kwirebero, in the Nyabikokora cell, Kirehe district, Rwanda.
Some children have to walk several kilometres to get to school. The construction of a new nursery and primary school will bring education closer to families and provide children with a safe learning environment tailored to their needs.

Project details ->
School image description

The Konankro State Primary School (EPP), situated in the Bodokro sub-prefecture in the Gbêkê region of Côte d’Ivoire, has around 120 pupils. Despite its vital role in the education of local children, the school requires additional facilities to improve learning conditions and meet the needs of its pupil population. The lack of sufficient classrooms limits the school’s ability to accommodate pupils in suitable conditions.

Furthermore, the shortage of suitable accommodation for teachers makes it more difficult for them to settle in the area and may jeopardise their long-term commitment to the school. In light of this situation, the construction of three additional classrooms and two staff flats is a pressing priority. The completion of these facilities would help to improve the school environment, facilitate the work of teachers and provide pupils with better conditions in which to learn and succeed.

Project details ->
School image description

The school have temporary buildings which built by wooden structures and the class rooms aren’t enough. Inadequate classroom equipments like furniture desks, toilet, sanitation equipments (water)

‍