
Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school
The schoolJodrine Junior Schoolis located precisely in the villageMukusuin the city ofGomba. Country : Uganda/East Africa.The school needsConstructionof classrooms, equipments and school infrastructure.
Jodrine Junior School
Many families struggle to afford school fees Inadequate classrooms and furniture Unfinished classroom blocks An incomplete well Dusty and uncemented classroom floors Inadequate textbooks and scholastic materials Absence of a permanent kitchen
Construction
Jodrine Junior School Mukusu serves 170 children in Gomba District, Uganda, across a community where more than five villages previously lacked access to a nearby community school. Many families struggle to afford school fees, making access to consistent and quality education difficult for vulnerable children. The school faces significant infrastructure and resource challenges, including inadequate classrooms and furniture, an unfinished classroom block, an incomplete well that limits access to a reliable water source, dusty and uncemented classroom floors, inadequate textbooks and scholastic materials, and the absence of a permanent kitchen.
These challenges affect the children’s learning environment, health, attendance and overall educational experience. As enrolment continues to grow, the school urgently needs support to improve its facilities, provide essential learning resources and ensure that children from disadvantaged families have access to safe, inclusive and quality education.


PROJECT DESCRIPTION: EXPANSION AND IMPROVEMENT OF JODRINE JUNIOR SCHOOL MUKUSU
Project Capacity: 400 pupils
1. Current Buildings and Classrooms
Jodrine Junior School Mukusu is a community-founded school in Gomba District, Uganda, established to bring education closer to children from more than five underserved villages. The school currently serves 170 pupils, including 102 girls and 68 boys.
The school has an existing permanent classroom block comprising four rooms and an office. However, the building is not yet completed and requires roofing and other finishing works. The school also faces inadequate classroom space and furniture, dusty and uncemented classroom floors, insufficient textbooks and learning materials, and the absence of a permanent kitchen.
A 5,000-litre water tank has been installed to harvest rainwater, but the school’s main well remains unfinished, limiting access to a reliable water source.
2. Project Objectives
The project aims to expand and improve the school’s infrastructure so that it can accommodate up to 400 children from Mukusu and neighbouring villages.
The specific objectives are:
1. Complete the existing classroom block: Finish the current four-room building and convert it into a fully functional nursery section accommodating Baby, Middle and Top classes.
2. Construct a new primary classroom block: Build additional classrooms to provide adequate and appropriate learning spaces for primary school pupils from Primary One to Primary Seven.
3. Construct a boarding facility: Establish a safe and suitable boarding section for children coming from distant villages who face difficulties travelling long distances to attend school daily.
4. Provide essential furniture and learning materials: Procure desks, chairs, teachers’ furniture, textbooks, exercise books and other scholastic materials.
5. Improve water, sanitation and hygiene: Complete the school’s well and improve access to safe water and appropriate sanitation facilities.
6. Establish a permanent school kitchen: Construct and equip a kitchen to support the preparation of meals for day scholars and boarding pupils.
7. Promote inclusive education: Create a safe, accessible and supportive learning environment for all children, including those with disabilities.
3. Material Requirements
The project will require:
* Roofing materials, including iron sheets, timber, nails and roofing accessories.
* Cement, sand, aggregates, bricks and other construction materials.
* Doors, windows, frames and building fittings.
* Construction materials for the new primary classroom block.
* Construction materials for the boarding facility, including beds, mattresses and storage facilities.
* Classroom desks, chairs, tables and teachers’ furniture.
* Textbooks, exercise books, stationery and teaching aids.
* Water infrastructure materials, plumbing supplies and well-completion materials.
* Kitchen construction materials, cooking equipment and storage facilities.
* Sanitation and hygiene facilities.
4. Expected Results
Upon completion, the project is expected to:
1. Increase the school’s capacity from its current 170 pupils to approximately 400 pupils.
2. Establish a fully functional nursery section and an expanded primary section with adequate classroom space.
3. Provide boarding accommodation for children from distant villages who would otherwise struggle to access daily education because of long travelling distances.
4. Improve access to education for children from more than five underserved villages.
5. Provide a safer, more comfortable and inclusive learning environment through improved classrooms, furniture and learning resources.
6. Improve access to water, sanitation, hygiene and school meals.
7. Reduce barriers to education for vulnerable children and increase opportunities for consistent school attendance and improved learning outcomes.
Long-term impact: Jodrine Junior School Mukusu will become a stronger community education centre capable of serving approximately 400 children, bringing quality education closer to families in Mukusu and surrounding villages, including children who live too far away to attend as day scholars.


3 classrooms
1 dormitory
1 canteen and school kitchen
1 multipurpose room
Flooring
Painting (existing building)
Doors, windows, and roof
1 water pump/borehole
1 electrical/solar installation
90 chairs and desks
30 sets of teaching materials
15 office furniture sets
3 computers and 2 printers
Construction
400
To be estimated
Received
See all current projects

Lack of school to that proposed area and student suffer to a long distance to reach for thier school, lack of infastructure that support school


The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.