Expansion of 6 new classrooms and Relocation - BRIGHT TRUST ACADEMY

Rwanda
|
Kanyamatembe Village, Kabujenje Cell

Problem/ Context

BRIGHT TRUST ACADEMY is an existing private school located in Kivumu Sector, Rutsiro District, Western Province, Rwanda.

The school currently provides nursery education to 71 learners using three small classrooms. The existing facilities are insufficient to accommodate additional learners and support the planned expansion into primary education. The school has acquired a new plot of approximately 2,155 square metres in Kanyamatembe Village, Kabujenje Cell, Kivumu Sector.

However, additional financial resources are required to construct classrooms and supporting facilities, provide adequate sanitation, extend the water supply, install electricity and purchase essential school furniture and educational materials. Without additional support, the school will face difficulties expanding its capacity and providing an appropriate learning environment for more children in the surrounding community.

Detailed project description

BRIGHT TRUST ACADEMY SCHOOL Ltd seeks financial or material support from Action For Africa to relocate and expand its existing school in Kivumu Sector, Rutsiro District, Rwanda.

The project proposes the construction of six classrooms, sanitation facilities, a teachers' room, an administration office, a storage room and a library. It also includes extending the water supply pipeline by approximately 700 metres, installing electricity, purchasing student desks and chairs, providing books and teaching materials, and constructing a perimeter fence with an entrance gate.The school currently serves 71 nursery learners and aims to accommodate approximately 180 additional learners, bringing the target enrolment to about 251 children, subject to available capacity and the required authorisations.

The total preliminary estimated project budget is RWF 260,609,822. This estimate covers construction, utilities, furniture, educational resources, transport and a contingency allowance. Final costs will be confirmed through technical assessments and quotations from qualified contractors and service providers.The project aims to improve access to education, create a safer and better-equipped learning environment, and support the planned introduction of primary education for children in the surrounding community.

‍

Informations générales
Project applicant
HAKIZIMANA Joel
Contacts
Owner and Managing Director
School name

BRIGHT TRUST ACADEMY

Location (village, region)
Kanyamatembe Village, Kabujenje Cell
Project category

Construction

Main needs

Extension : nouvelles salles de classes,Installations scolaires,Équipements scolaires,Autres (à préciser)

Target learners

251

Coût du projet

$176,685 appr. 260,609,822 RWF

Project status

Received

Required Materials and Equipment
Construction icone
Buildings to Be Constructed

Six (6) classrooms
A staff room and an administrative office,
A storage room and a library
A perimeter fence with an entrance gate.

Construction icone
Installations scolaires

6 blocks of toilets
Extension of the water mains by 700 metres
Electrical installations

‍

Construction icone
Equipment, Materials, and Furniture

180 desks and benches for pupils
230 books and teaching materials

‍

School Photos

Toutes les autres écoles

Retrouvez toutes les candidatures transmises par les villages

The klapleu modern middle school is a school established in a rural area. It is planned to operate on a two-track basis from sixth grade through ninth grade, which means a projected total of 8 classrooms. However, since its opening in 2025, there have been only 4 classrooms instead of the 8 planned. From 20 students at the start, there are now 173 students spread across 3 grade levels (6th, 5th, and 4th). The growing student enrollment. Therefore requires the construction and equipment of the remaining 4 classrooms.

‍

Voir l'école

The CRS school, founded in 1995, serves students from disadvantaged backgrounds. As a result, it faces many challenges that affect academic performance. In addition, the poor condition of the restrooms makes the children feel uncomfortable. Consequently, they relieve themselves outside the school.

‍

Voir l'école

For the past three years, we have been renting a room and space to house our preschool.
We started with 40 students and now have 80. We serve students in the younger, middle, and older preschool classes, as well as a special education class designed to support children who left public school at a very young age, as well as those facing learning challenges, to help them overcome them.
With our limited resources, we are struggling not only to build our own school but also to accommodate more students.

‍