Problem/ Context

Context and Problem StatementRwanda has placed inclusive basic education at the heart of its national development strategy. The local NGO ACDS actively works in this area through the management of its school, "La Fraternité". However, faced with local population growth

‍

Detailed project description

NGO Name: ACDS (Christian Action for Social Development)
RGB Registration No: 508/RGB/NGO/LP/05/2019
Kigali, Rwanda

CONCEPTUAL NOTE FOR THE SCHOOL RECONSTRUCTION PROJECT
Project: Modern reconstruction with additional floors and equipment for the "La Fraternité" nursery and primary school
Location: Republic of Rwanda
Direct beneficiaries: +600 students (nursery, preschool, and primary levels)
Total construction budget: 650,000,000 RWF (393,345.74 EUR)
Current technical status: Secured land (owned by the SCHOOL), Building permit obtained, Architectural engineering plans and Cost Estimate approved (Ready-to-Build Project).

1. Context and Problem Statement
Rwanda has placed inclusive basic education at the heart of its national strategy development. The local NGO ACDS actively works in this area through the management of its school, "La Fraternité." However, faced with strong local population growth and pressure on existing infrastructure, the current premises have become obsolete, cramped, and overcrowded. Overcrowded classrooms threaten the children's health and safety and drastically limit educational potential. To meet the influx of requests from vulnerable families, the school urgently needs a major structural transformation.

2. Project Objectives
The main objective is to demolish the dilapidated ground-level structures and build a modern, multi-story school complex (ground floor + 1/2 floors), optimizing the NGO's available land.

• Increased capacity: To transfer and educate more than 600 students in conditions of dignity and optimal safety.

• Sustainable infrastructure: To provide spacious, well-ventilated, and equipped classrooms, administrative offices for staff, and a building Modern sanitary facilities strictly compliant with eco-responsible sanitation standards (Eco-WASH).

3. Description of Activities and Budget
The project is ready for immediate implementation thanks to the prior approval of all regulatory documents by the district. The total budget of RWF 650,000,000 (EUR 393,345.74) is divided into four main funding components:
1. Structural Work and Elevation (60%): Special foundations for multi-story structures, heavy masonry, reinforced concrete slabs, and eco-resilient metal roofing.

2. Interior Work and Finishing (15%): Plumbing, electrical work, carpentry (doors/windows), plastering, and flooring.

3. Eco-WASH Sanitation Facility (10%): Construction of separate latrines for girls and boys and installation of a rainwater harvesting system.

4. Furnishings and Equipment (10%): Complete provision of school furnishings in desks and benches, administrative offices, and teaching materials.

(A 5% contingency is maintained for technical inspections and unforeseen material costs).

4. Social Impact and Sustainability (Self-Financing)
• Impact: Immediate access to quality basic education for 600 children, reduced school dropout rates, and early integration through modern preschool programs.

• Financial Sustainability: The NGO ACDS guarantees long-term viability without continuous dependence on donors for operations. Teacher salaries will be covered by an integration agreement with the Ministry of Education (MINEDUC/REB). Operating costs, utilities, and building maintenance will be covered independently through a proven self-financing model: a family-friendly, solidarity-based schooling system, rental income from the facility during holidays, and a structural balancing grant from the NGO ACDS.

MUKIZA Emmanuel
Executive Director of the organization (ACDS)

Informations générales
Project applicant
Christian Action for Social Development (ACDS)
Executive Director of the organization
Contacts
School name

La Fraternité

Location (village, region)
ayabakora
Project category

Construction

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

Building: 1st and 2nd floors

‍

Construction icone
Installations scolaires

6 restroom blocks

Construction icone
Equipment, Materials, and Furniture

150 desks and benches
30 sets of teaching materials
40 school kits

School conditions

The current facilities are outdated Classrooms are overcrowded Restroom block in poor condition Lack of desks, benches, and supplies

Target learners

600 Elèves

Coût du projet

650,000,000 RWF (393,345.74 EUR)

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

Manatido Nations Chapel Mission School was established in 2020 in Manatido, Tatale-Sanguli District, Northern Region, Ghana. The school currently serves 207 children but faces challenges with classroom space, desks and chairs, textbooks, and teaching materials. These challenges affect the learning environment and the quality of education available to the children. We are seeking support to construct additional classrooms, improve existing facilities where necessary, and provide essential educational resources to create a better learning environment for all 207 students.

Project details ->
School image description

The needs are much greater than what I can continue to carry alone. Our current needs include additional classrooms, desks and chairs, textbooks and school supplies, support for children's meals, toilets and sanitation facilities, playground equipment, and transportation for children who live far from the school.

Project details ->
School image description

TESTIMONI SPECIAL SCHOOLS NGBO LTD is experiencing increasing pressure on its existing classroom facilities as the number of students continues to grow. The school currently serves more than 600 students from JSS1 to SS3, with further admissions expected during the current term.
‍
The existing classroom facilities are not sufficient for the growing student population. Some of the available learning spaces are also below the standard learning environment the school seeks to provide, including classrooms with bare or sandy floors and open-sided conditions.

This shortage of suitable classroom space is becoming an important challenge to the school's ability to provide an adequate and comfortable learning environment for all its students. Without additional classrooms, continued growth in enrollment will place further pressure on the existing facilities.

The school therefore seeks support for the construction of additional permanent classrooms to increase capacity and provide students with a more suitable environment for teaching and learning.