Construction
Publié le
|
07/11/2026

Construction of 4 Classrooms - Botolon Acadamy

Ethiopia
|
Gidole Town

Problem/ Context

Botolon Bright Future Academy is a community-established educational institution located in Gidole, Gardulla Zone, Southern Ethiopia. The school was established through the initiative and commitment of the local community to provide educational opportunities for children and contribute to sustainable community development. However, the school is facing serious challenges due to inadequate educational infrastructure. It does not have sufficient classrooms to accommodate its students and also lacks essential facilities, including a dining hall, library, adequate toilet facilities, and a staff room. These shortages negatively affect the teaching and learning environment, student participation, and the overall quality of education. Therefore, the construction of four additional classrooms is urgently needed to address the existing infrastructure gap.

Detailed project description

Project Objectives
The main objective of the project is to improve access to quality education by constructing four standard classrooms and creating a safe, comfortable, and conducive learning environment for students and teachers. Specifically, the project aims to reduce classroom shortages and overcrowding, increase the school's capacity to accommodate more students, improve teaching and learning conditions, promote equal educational opportunities for boys and girls, and strengthen the school's educational services. The project will also contribute to the long-term educational and social development of the surrounding community.

Material Requirements
The successful implementation of the project requires construction materials, labor, and technical support. The major material requirements include cement, sand, gravel, stones, reinforcement bars, bricks or concrete blocks, roofing sheets, timber, nails, doors, windows, glass, paint, electrical materials, and flooring materials. Additional requirements include construction tools and equipment, transportation services, skilled and unskilled labor, and basic classroom furniture such as student desks, chairs, teacher tables, and blackboards. The exact quantities and costs of these materials will be determined through a detailed bill of quantities (BOQ) and technical assessment based on the approved architectural and engineering designs.

Expected Results
Upon successful completion, the project is expected to deliver four fully constructed and functional classrooms equipped with basic educational furniture. The additional classrooms will reduce overcrowding, improve student concentration and participation, create better working conditions for teachers, and increase the school's capacity to enroll more children. Furthermore, the project will improve the overall school environment, strengthen community confidence in the educational institution, and contribute to improved access to quality education for children in Gidole and surrounding communities.

Sustainability and Appeal for Support
Botolon Bright Future Academy, together with the local community, will take responsibility for protecting, maintaining, and managing the newly constructed classrooms to ensure their long-term use. The school will collaborate with relevant government institutions and community stakeholders to support the continued operation and maintenance of the facilities. Therefore, the school appeals to governmental and nongovernmental organizations, international development partners, charitable foundations, philanthropists, and concerned individuals to provide financial, material, and technical support for the successful implementation of this project. Supporting the construction of these four classrooms means investing in children's education, empowering the community, and building a brighter future for generations to come.

Informations générales
Project applicant
Mekuanint Timbula
Project Assistant
Contacts
School name

Botolon Bright Future Acadamy

Location (village, region)
Gidole Town
School conditions

No sufficient classrooms Absence of dining hall, library Lack of toilet facilities Lack of staff room

Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

4 new classrooms
Dining hall
Library
‍

Construction icone
Installations scolaires

6 sanitary blocks
1 electrical/solar system

Construction icone
Equipment, Materials, and Furniture

75 school benches
20 sets of teaching materials
120 school kits and textbooks
20 pieces of furniture
1 School bus

Project category

Construction

Target learners

300

Coût du projet

Evaluation to be done

Project status

Received

School Photos

Other construction projects

See all current projects

School image description

NEW HOPE Nursery and Primary School, located in Mbata Village, Mbata Parish, Bwesumbu Sub-County, Kasese District, Uganda, is facing a serious challenge of inadequate permanent classroom infrastructure. The school currently serves 316 pupils and employs 13 teachers, but it lacks permanent classroom buildings to provide a safe, stable, and conducive learning environment for its learners.The absence of permanent classrooms exposes pupils to difficulties during adverse weather conditions and affects the effective delivery of lessons. It also limits the school's ability to improve the quality of education, provide adequate learning space, and support the educational needs of children from rural and economically disadvantaged families.

The school owns land on which permanent classrooms can be constructed; however, limited financial resources have made it difficult for the school administration and parents to undertake the construction independently.

This situation threatens the school's efforts to provide quality and inclusive education to children in the community. We therefore urgently seek support for the construction of five permanent classrooms at an estimated cost of UGX 56,000,000. The project will improve learning conditions, strengthen teaching effectiveness, and provide a better educational foundation for the 316 pupils currently enrolled at NEW HOPE Nursery and Primary School.

Project details ->
School image description

We need six additional buildings to develop a complete primary school and provide children with proper access to education. Many children in our community are at risk of growing up without an education, losing opportunities, direction and hope for a better future simply because we lack adequate educational facilities.The nearest primary school from Olpopongi is approximately 9 kilometres away. There is a large river between the village and the school, which becomes difficult and sometimes impossible for children to cross during the rainy season. Our area is also home to wild animals, including elephants, which can pose a serious danger to children travelling long distances on foot.These challenges make accessing education extremely difficult and sometimes unsafe for our children. We believe every child deserves the opportunity to learn, follow their dreams and build a better future, regardless of where they are born

Project details ->
School image description

Context and Problem StatementRwanda has placed inclusive basic education at the heart of its national development strategy. The local NGO ACDS actively works in this area through the management of its school, "La Fraternité". However, faced with local population growth

‍

Project details ->