Construction
Publié le
|
07/11/2026

Building of Ten Classrooms - Baptist Hillview School

Kenya
|
Namunyiri,Nzoia ward and Likuyani constituency

Introduction

The schoolBaptist Hillview schoolis located precisely in the villageNamunyiri,Nzoia ward and Likuyani constituencyin the city ofNairobi. Country : Kenya/East Africa.The school needsConstructionof classrooms, equipments and school infrastructure.

General information
Project applicant
Peter Musau
School Director
Contacts
School name

Baptist Hillview school

Location (village, region)
Namunyiri,Nzoia ward and Likuyani constituency
Target beneficiairy
203 pupils and 17 teachers
School conditions

Temporary corrugated iron classrooms No permanent classrooms Outdated infrastructure Lack of rain protection Overcrowded classrooms

Project category

Construction

Context

Baptist Hillview School faces several challenges that affect the quality of education and the learning environment for its pupils. The school currently serves 203 pupils but has inadequate permanent classroom facilities to accommodate all learners comfortably. The existing classrooms are temporary and have poor infrastructure, including muddy floors and inadequate protection against harsh weather conditions such as heavy rains, strong winds, and excessive heat. These conditions make teaching and learning difficult, especially during the rainy season.

The shortage of classrooms also creates space constraints, making it difficult for teachers to organize lessons effectively and provide learners with a comfortable learning environment.

The school also faces financial challenges and lacks sufficient resources to construct permanent classrooms and improve its facilities. Limited external support has made it difficult to address these infrastructure needs.

To overcome these challenges, Baptist Hillview School urgently requires financial support to construct 10 permanent classrooms. This will provide a safer, cleaner, and more conducive learning environment, improve teaching and learning conditions, and support the educational development of the 203 pupils.

‍

Logo Action For Africa

Detailed project description

PROJECT TITLE: CONSTRUCTION OF 10 PERMANENT CLASSROOMS AT BAPTIST HILLVIEW SCHOOL

1. PROJECT DESCRIPTION AND CURRENT BUILDING SITUATION

Baptist Hillview School is a private non-profit project school located in Namunyiri, Nzoia Ward, Kakamega County, Kenya. The school was registered on 7 September 2016 and currently serves approximately 203 pupils, supported by 17 teachers and support staff.

The school is facing serious challenges due to inadequate and unsuitable classroom facilities. The existing classrooms are temporary structures that do not provide a safe, comfortable and conducive learning environment. Some classrooms have muddy floors, weak walls and inadequate protection against rain, wind and other harsh weather conditions.

During rainy seasons, the classrooms become muddy and uncomfortable, making teaching and learning difficult. Limited classroom space also causes congestion and affects pupils' concentration and academic performance.

The school owns the land on which it operates, but the existing facilities are insufficient to meet the educational needs of the growing community.

The proposed project aims to construct 10 permanent classrooms to replace inadequate learning structures and provide a safe, clean and comfortable environment for pupils and teachers.

2. PROJECT OBJECTIVES

The project aims to:

1. Construct 10 permanent and durable classrooms.
2. Replace temporary and unsuitable learning structures.
3. Provide a safe, clean and comfortable learning environment.
4. Reduce classroom congestion and improve learning conditions.
5. Protect pupils and teachers from harsh weather conditions.
6. Improve the quality of teaching and learning.
7. Increase the school's capacity to accommodate more children.
8. Promote access to quality education for children in the surrounding community.

3. MATERIALS REQUIRED

The construction project will require the following materials:

- Cement for foundations, floors, plastering and construction.
- Building stones or suitable building blocks.
- Sand and ballast.
- Reinforcement steel bars.
- Roofing timber and treated structural timber.
- Roofing iron sheets.
- Roofing nails and ordinary construction nails.
- Doors and window frames.
- Glass panes and window fittings.
- Paint for internal and external finishing.
- Floor finishing materials.
- Electrical wiring and lighting fixtures.
- Locks and security fittings.
- Construction tools and equipment.
- Skilled and unskilled labour.
- Professional construction supervision.

4. EXPECTED RESULTS

Upon completion of the project, the school expects to achieve the following results:

1. Ten permanent classrooms will be constructed and ready for use.
2. Approximately 203 pupils will benefit from improved learning facilities.
3. Pupils will have access to safer and more comfortable classrooms.
4. Muddy and unsuitable learning conditions will be eliminated in the new classrooms.
5. Classroom congestion will be reduced.
6. Teachers will have a better working environment.
7. More children from the surrounding community will have an opportunity to access education.
8. The school will have improved infrastructure and increased capacity to serve future generations.

5. PROJECT BENEFICIARIES

The direct beneficiaries will include:

- 203 pupils currently enrolled at Baptist Hillview School.
- 17 teachers and support staff.
- Children from Namunyiri and neighbouring communities.
- Parents and guardians.
- Future generations of pupils joining the school.

6. FUNDING REQUIRED

The total funding requested for this project is KSh 15,000,000 (Fifteen Million Kenyan Shillings).

The funds will be used for the construction of 10 permanent classrooms, including purchasing construction materials, paying skilled and unskilled labour, and meeting other necessary construction expenses.

The school welcomes full funding or partial classroom sponsorship from individual donors, charitable foundations, organizations, companies and well-wishers.

7. PROJECT SUSTAINABILITY

Baptist Hillview School owns the land where the construction will take place. The school management will take responsibility for maintaining the completed classrooms, ensuring proper use of the facilities and keeping the learning environment clean and safe.

The school will also mobilize support from parents, community members, well-wishers and development partners to support maintenance and future improvements.

OUR VISION

To provide every child with a safe, dignified and supportive learning environment where they can learn, grow and build a better future through quality education.

Logo Action For Africa
Works / Equipment to be provided
Construction icone
Buildings to Be Constructed

10 permanent classrooms
1 administration building
1 school fence and gate
1 multipurpose room

Renovation icone
Renovation and Restoration

Painting and carpentry
Doors and windows
Roof waterproofing and repair
Flooring

Construction icone
Installations scolaires

1 borehole/drinking water system
1 electrical/solar installation

Construction icone
Equipment, Materials, and Furniture

70 desks and benches
15 sets of office furniture
35 sets of teaching materials
4 computers and 2 printers

Project category

Construction

Target learners

203 pupils and 17 teachers

Cost estimation

To be estimated

Project status

Received

All images of the school

Other construction projects

See all current projects

School image description

Korlela Public School in Korlela Village, Quardu-Gboni District, Lofa County, Liberia serves 280 registered students, but its buildings and facilities are in urgent need of repair. Classroom roofs leak, ceilings are destroyed, walls are deteriorating, and windows and doors are damaged. The toilets are unsafe, with weakened pits that may collapse. The school also lacks basic learning materials and furniture, including textbooks, notebooks, blackboards, desks, chairs, and tables. It has no reliable access to clean water.
Because the school is unsafe and unsuitable for learning, fewer than 200 students are currently attending classes regularly. The school reports that 2–5 students in each class drop out each month, and attendance has been disrupted for more than a year. Some students must leave class and walk long distances to collect water for drinking and using the toilets, causing them to miss lessons.
Most families depend on farming and have limited incomes, so they cannot afford to repair the school or provide the materials and water students need. Without urgent support, the school may be forced to close before the current academic year ends, leaving children in this rural community without a safe and effective place to learn.

Project details ->
School image description

La Source Private High School, located in Sahamadio, in the municipality of Fandriana, accommodates approximately 500 students, from preschool to high school. Faced with an increasing number of students, the need for school furniture and supplies is becoming ever more critical. Some students do not always have sufficient resources to attend classes effectively.

This situation can limit their comfort and participation in school activities. It is therefore necessary to improve the school's equipment to provide a suitable learning environment for all students.

Project details ->
School image description

Lack of Textbooks and Teaching Materials for 250 Students from Vulnerable Families

Project details ->